Rehabilitation / Major Repair of Flood Control Structure23FA0047

Rehabilitation of Flood Control at Maangot River, Purok 2, Barangay San Isidro, Sto. Domingo, Albay

Rehabilitation of Flood Control at Maangot River, Purok 2, Barangay San Isidro, Sto. Domingo, Albay is a DPWH-tracked public work in SANTO DOMINGO (LIBOG) (ALBAY), ALBAY, Region V. Reported contract value: ₱72,375,000.00. Status: Reported complete (DPWH). Contractor on record: A3 CONST & SUPPLY. Figures trace to sumbong.

SANTO DOMINGO (LIBOG) (ALBAY), ALBAY, Region V
Region: Region V

Money Trail

1. Appropriation

Probable match · score 92%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System at San Rafael River, Sto. Domingo, Albay
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Albay 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

24 projects · ₱1.6B total · 1 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0554+068-K0554+598.5,K0554+756-K0555+049.5, PIO DURAN,ALBAY

Region V, Region V

2023₱144.7M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0551+880-K0552+000,K0552+559-K0552+707.5, PIO DURAN,ALBAY

Region V, Region V

2023₱144.7M
Reported complete (DPWH)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY TANAG, LIBMANAN, CAMARINES

Camarines Sur 2nd DEO, Region V

2024₱138.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ROAD WIDENING - SECONDARY ROADSJCT. TAFT - ORAS - SAN POLICARPO - ARTECHE RD (S00167SM), K0965+923 - K0968+000, K0968+537 - K0969+749

Eastern Samar DEO, Region VIII

2025₱119.7M
Ongoing (DPWH-reported)

Construction of Flood Control System along Barangay Sumlang to Barangay Gapo, Camalig, Albay

CAMALIG (ALBAY), ALBAY, Region V

2024₱96.5M
Reported complete (DPWH)

Construction of Flood Mitigation and Drainage Structure along Quirangay River, Camalig, Albay (Package 1)

CAMALIG (ALBAY), ALBAY, Region V

2024₱96.5M
Reported complete (DPWH)
View all 24 projects →

4. Implementation

Contract Amount

₱72,375,000.00

Progress

Reported complete (DPWH)

Start Date

June 1, 2023

Target End

December 24, 2023

5. Audit