Water Provision and Storage24HO0147

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-RAINWATER COLLECTOR SYSTEM, RAINWATER COLLECTORS IN PUBLIC FACILITIES-BULLOGAN ES, DUMANJUG; HIPOLITO BOQUECOSA MNHS, DUMANJUG; LAWAAN ES, DUMANJUG; TUPAS ES, RONDA, LANAO ES, MOALBOAL, TUBLE ES, MOALBOAL, SAAVEDRA

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-RAINWATER COLLECTOR SYSTEM, RAINWATER COLLECTORS IN PUBLIC FACILITIES-BULLOGAN ES, DUMANJUG; HIPOLITO BOQUECOSA MNHS, DUMANJUG; LAWAAN ES, DUMANJUG; TUPAS ES, RONDA, LANAO ES, MOALBOAL, TUBLE ES, MOALBOAL, SAAVEDRA is a DPWH-tracked public work in Cebu 7th DEO, Region VII. Reported contract value: ₱2,882,230.00. Status: Past target date (DPWH On-Going). Contractor on record: DT&C CONST. Figures trace to dpwh.

Cebu 7th DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱2,882,230 · DT&C CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    98% reported · imagery 2018-06-04 → 2018-06-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM-RAINWATER COLLECTOR SYSTEM, RAINWATER COLLECTORS IN PUBLIC FACILITIES-BULLOGAN ES, DUMANJUG; HIPOLITO BOQUECOSA MNHS, DUMANJUG; LAWAAN ES, DUMANJUG; TUPAS ES, RONDA, LANAO ES, MOALBOAL, TUBLE ES, MOALBOAL, SAAVEDRA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Revetment Wall along Talaba River Flood Control, Barangay Canduling, Ronda, Cebu
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Cebu 7th DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

4. Implementation

Contract Amount

₱2,882,230.00

Progress

Past target date (DPWH On-Going)

Start Date

July 9, 2024

Target End

August 22, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuMoalboalBatadbatad
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.