Buildings and Facilities17MB0149No coordinates published by DPWH

CONSTRUCTION OF SCHOOL BUILDING 1 STOREY 2 CLASSROOMS AT KALKAM ELEMENTARY SCHOOL (BUILDING 2), TUPI, SOUTH COTABATO

CONSTRUCTION OF SCHOOL BUILDING 1 STOREY 2 CLASSROOMS AT KALKAM ELEMENTARY SCHOOL (BUILDING 2), TUPI, SOUTH COTABATO is a DPWH-tracked public work in South Cotabato 1st DEO, Region XII. Reported contract value: ₱2,630,285.51. Status: Reported complete (DPWH). Contractor on record: COFEJOK CONST AND SUPPLY CORP FORME. Figures trace to dpwh.

South Cotabato 1st DEO, Region XII

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-17-0014366 · ₱181,800 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17MB0149 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SCHOOL BUILDING 1 STOREY 2 CLASSROOMS AT KALKAM ELEMENTARY SCHOOL (BUILDING 2), TUPI, SOUTH COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/Improvement of Brgy Carpenter Hill Flood Control and bank protection along Marbel River, Koronadal City, South Cotabato
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-17-0014366

₱181,800.00 · FY2017

Released to Nabunturan Per National Comprehensive High Jul School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

169 projects · ₱1.6B total · 1 flags

4. Implementation

Contract Amount

₱2,630,285.51

Progress

Reported complete (DPWH)

Start Date

January 10, 2018

Target End

April 19, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.