Bridges25PJ0024

25PJ0024: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-MONGGAYANG BR (B04884LZ) ALONG UBAO-TAANG ROAD

25PJ0024: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-MONGGAYANG BR (B04884LZ) ALONG UBAO-TAANG ROAD is a DPWH-tracked public work in Ifugao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱24,499,950.61. Status: Reported complete (DPWH). Contractor on record: MA CONST. Figures trace to dpwh.

Ifugao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25PJ0024 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-11-10 → 2016-11-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: 25PJ0024: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-MONGGAYANG BR (B04884LZ) ALONG UBAO-TAANG ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Poblacion Pakawit Communal Irrigation System (CIS), Tinoc, Ifugao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ifugao 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

49 projects · ₱715.4M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BRIDGE (UMILAG), LAMUT, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2025₱67.5M
Past target date (DPWH On-Going)
No sat.

25PJ0030: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 40 +075- STA. 40+640, SAN JUAN, ALFONSO LISTA, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2025₱55.7M
Past target date (DPWH On-Going)
No sat.

23PJ0016: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-ALFONSO LISTA-SAN MANUEL DIVERSION ROAD, IFUGAO STA. 2 +062.80-STA. 2 +514.50, STA. 5 +204.80-STA. 5+780, ALFONSO LISTA, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2023₱39.2M
Reported complete (DPWH)
No sat.

24PJ0004: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-NUEVA VIZCAYA-IFUGAO-MT PROVINCE RD-K0337+050-K0337+111, K0340+940-K0340+971, K0347+618-K0347+632, K0349+146-K0349+173

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱36.7M
Reported complete (DPWH)
No sat.

24PJ0013: ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS-BANAUE-HUNGDUAN-BENGUET BDRY RD - K0342 + (-107), K0342 + 047, K0342 + 293, K0342 + 473 - K0342 + 570, K0342 + 885, K0343 +

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱35.6M
Reported complete (DPWH)
No sat.

24PJ0003: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0341 + (-104) - K0341 + (-084), K0358 + (-034) - K0358 + 026, K0361 + 160

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱34.3M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱24,499,950.61

Progress

Reported complete (DPWH)

Start Date

February 28, 2025

Target End

July 29, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.