Flood Control and Drainage25PJ0030

25PJ0030: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 40 +075- STA. 40+640, SAN JUAN, ALFONSO LISTA, IFUGAO

25PJ0030: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 40 +075- STA. 40+640, SAN JUAN, ALFONSO LISTA, IFUGAO is a DPWH-tracked public work in Ifugao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱55,656,287.36. Status: Past target date (DPWH On-Going). Contractor on record: MA CONST. Figures trace to dpwh.

Ifugao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱55,636,703 · M A CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    99% reported · imagery 2023-08-12 → 2025-06-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱98,507 per linear m= 1.3x the Cordillera Administrative Region median (n=212)

Contract cost ₱55,656,287 ÷ 565 linear m read from the DPWH title (“STA. 40 +075- STA. 40+640”; station range length (Sta. a+b to c+d)). National percentile: 40. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Ifugao

Based on the coordinates published with the DPWH record and NOAH file Ifugao.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: 25PJ0030: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 40 +075- STA. 40+640, SAN JUAN, ALFONSO LISTA, IFUGAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Poblacion Pakawit Communal Irrigation System (CIS), Tinoc, Ifugao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Ifugao 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25PJ0030 Flood Management Program-Construction/ R

₱55,636,702.52 · M A CONSTRUCTION

Contractor

B

49 projects · ₱715.4M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF BRIDGE (UMILAG), LAMUT, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2025₱67.5M
Past target date (DPWH On-Going)
No sat.

23PJ0016: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-ALFONSO LISTA-SAN MANUEL DIVERSION ROAD, IFUGAO STA. 2 +062.80-STA. 2 +514.50, STA. 5 +204.80-STA. 5+780, ALFONSO LISTA, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2023₱39.2M
Reported complete (DPWH)
No sat.

24PJ0004: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-NUEVA VIZCAYA-IFUGAO-MT PROVINCE RD-K0337+050-K0337+111, K0340+940-K0340+971, K0347+618-K0347+632, K0349+146-K0349+173

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱36.7M
Reported complete (DPWH)
No sat.

24PJ0013: ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS-BANAUE-HUNGDUAN-BENGUET BDRY RD - K0342 + (-107), K0342 + 047, K0342 + 293, K0342 + 473 - K0342 + 570, K0342 + 885, K0343 +

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱35.6M
Reported complete (DPWH)
No sat.

24PJ0003: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0341 + (-104) - K0341 + (-084), K0358 + (-034) - K0358 + 026, K0361 + 160

Ifugao 2nd DEO, Cordillera Administrative Region

2024₱34.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEM-WATER SUPPLY SYSTEM-CONSTRUCTION OF LEVEL III WATER SUPPLY SYSTEM, MAYOYAO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2022₱33.3M
Reported complete (DPWH)
View all 49 projects →

4. Implementation

Contract Amount

₱55,656,287.36

Progress

Past target date (DPWH On-Going)

Start Date

April 7, 2025

Target End

October 6, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)IfugaoAlfonso ListaSan Juan
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Matmo 2025Ragasa 2025Mitag 2025
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.