CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BLK. 7-13 AND SECONDARY ROAD BLK. 10-14 BANAI LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT)
CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BLK. 7-13 AND SECONDARY ROAD BLK. 10-14 BANAI LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT) is a DPWH-tracked public work in Rizal 1st DEO, Region IV-A. Reported contract value: ₱28,531,105.23. Status: Past target date (DPWH On-Going). Contractor on record: DJL ROBLES BUILDERS. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
