DJL ROBLES BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 82 linked DPWH project(s) totaling about ₱540,318,077.28. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
DJL ROBLES BUILDERS
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 82
- Total value
- ₱540,318,077.28
- Published flags
- 0
- Region
- Rizal 1st DEO · Region IV-A
Licensed officers (PCAB)
- Darryl Jel Luzanta Robles · Authorized Managing Officer (PCAB license 39672) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for DJL ROBLES BUILDERS — not an accusation or finding of wrongdoing.
Score: 75.10 / 100 · Projects in sample: 82 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 57.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 57.4
- lateCompletedProjects
- 12
- onTimeCompletedProjects
- 48
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 77
- pastTargetOngoingProjects
- 17
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 92.7/100 · Weight: 24%
- totalProjects
- 82
- componentScore
- 92.7
- terminatedProjects
- 2
- terminationRatePct
- 2.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 80
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 82
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 82
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 48 of 69 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT BLK. 7-13 AND SECONDARY ROAD BLK. 10-14 BANAI LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT)25DN0099 · ₱28,531,105.23 · mapped
- IMPROVEMENT/ REHABILITATION OF ROAD AND DRAINAGE ALONG VINZONS ST. AND JOSE ABAD SANTOS, Q.C.19OF0143 · ₱24,125,000.00 · mapped
- CONSTRUCTION OF ROADAT BARANGAY APOLONIO SAMSON, QUEZON CITY22OF0156 · ₱23,764,915.80 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEM, BARANGAY PALANGOY BINANGONAN, RIZAL (FIRST DISTRICT)24DN0105 · ₱19,799,935.64 · mapped
- Construction/Rehabilitation of Flood Control Structures at Angono River, Brgy. San Roque, Angono, Rizal22DN0077 · ₱19,600,000.00 · mapped
- REHABILITATION OF SEMINARY ROAD / ROAD 12 STREET, BRGY. BAHAY TORO, QUEZON CITY21OF0051 · ₱19,126,800.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT VICTORIA HEIGHTS (DISASTER RESILIENCE CENTER) BRGY. SAUYO, QUEZON CITY23OF0112 · ₱18,841,174.70 · mapped
- CONSTRUCTION OF ROAD AT BLK. 16 AND 17, PUROK 2 LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT)25DN0080 · ₱15,209,598.07 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PAYATAS, QUEZON CITY22OF0221 · ₱14,404,500.50 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM, BLK. 9-12 PILAMAHOA LUPANG ARENDA, BRGY. STA. ANA TAYTAY, RIZAL24DN0106 · ₱14,374,375.42 · mapped
- Construction of Flood Control Structure at Angono River, Angono, Rizal22DN0076 · ₱9,900,000.00 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT BLK 18 AND BLK 19, PUROK 4, LUPANG ARENDA, BRGY. STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT)23DN0079 · ₱9,899,997.76 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT ROAD 1 TAPAYAN PUROK 1 LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL (FIRST DISTRICT)23DN0062 · ₱9,899,498.20 · mapped
- OO2: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION WITH SLOPE PROTECTION OF CAINTA RIVER, BRGY. STO. DOMINGO, CAINTA, RIZAL18DN0088 · ₱9,800,000.00 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE, BLOCK 25, 26, 27, 28, 29, 30. PUROK 5, LUPANG ARENDA, BARANGAY STA. ANA, TAYTAY, RIZAL22DN0111 · ₱9,799,949.68 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, TAYTAY, RIZAL (FIRST DISTRICT)23DN0124 · ₱9,799,572.75 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAINWATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, ANGONO, RIZAL (FIRST DISTRICT)23DN0132 · ₱9,799,402.09 · mapped
- CONSTRUCTION OF DRAINAGE SYSTEMS AT FERCON AND CONNECTING DRAINAGES, BRGY. TANDANG SORA, QUEZON CITY24OF0110 · ₱9,698,413.20 · mapped
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, FATIMA ST., BARANGAY DALIG, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)22DN0045 · ₱9,602,388.23 · mapped
- REHABILITATION OF DRAINAGE ALONG PAROLA STREET, BARANGAY SAN ANDRES CAINTA, RIZAL (FIRST DISTRICT)25DN0108 · ₱9,601,861.50 · mapped
- LOCAL PROGRAM- LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM- CONSTRUCTION OF ROAD AT SITIO BUGARIN, BARANGAY HALAYHAYIN, PILILLA, RIZAL19DO0081 · ₱9,593,098.92 · mapped
- REHABILITATION OF DRAINAGE, BARANGAY SAN ISIDRO CAINTA, RIZAL (FIRST DISTRICT)22DN0100 · ₱9,515,574.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NEW ERA, QUEZON CITY22OF0124 · ₱9,505,984.62 · mapped
- REHABILITATION OF ROAD AND DRAINAGE SYSTEM AT CECILIO BLANCO, SITIO PEDRO CRUZ, BARANGAY PAG-ASA BINANGONAN, RIZAL (FIRST DISTRICT)24DN0118 · ₱9,505,887.30 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, BINANGONAN, RIZAL (FIRST DISTRICT)23DN0123 · ₱9,505,237.85 · mapped
- REHABILITATION OF PANALTURAN STREET, QUEZON CITY21OF0043 · ₱9,476,585.22 · mapped
- CONCRETING OF SITIO PULONG LIGAYA, BRGY. BAGUMBONG FRM, JALAJALA, RIZAL18DO0085 · ₱9,454,530.06 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM, ROAD 1, PUROK 1 AND BLK. 1 PUROK 2 SAMABALAI, LUPANG ARENDA, BARANGAY STA. ANA TAYTAY, RIZAL (FIRST DIS24DN0062 · ₱8,909,964.35 · mapped
- CONSTRUCTION OF ROAD AT SITIO TAPAYAN, BARANGAY SAN JUAN, TAYTAY, RIZAL (FIRST DISTRICT)22DN0094 · ₱7,919,925.92 · mapped
- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, PUROK 4, ZONE 8, COLLEGE VIEW PARK, BARANGAY CUPANG ANTIPOLO CITY, RIZAL (SECOND DISTRICT)23DN0015 · ₱6,929,998.69 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY APOLONIO SAMSON, QUEZON CITY22OF0118 · ₱6,654,200.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD; ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG AGHAM ROAD (SO5395LZ) K0011+(-252) - K001+000, QUEZON CITY22OF0003 · ₱6,317,954.85 · mapped
- FY 2023 DPWH INFRASTRUCTURE PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE BUILDING AT PUROK LOGCOM, BRGY. DELA PAZ ANTIPOLO CITY (FIRST DISTRICT)23DN0139 · ₱5,335,082.55 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE BUILDING AT PHASE 3, STA. ELENA VILLAGE, BRGY. SAN JOSE, ANTIPOLO CITY (SECOND DISTRICT)23DN0096 · ₱5,281,858.50 · mapped
- LOCAL PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILTIES - LOCAL INFRASTRUCTURE PROGRM - RIPRAPPING OF CALERO CREEK GOING TO CANIOGAN, BRGY. CANIOGAN-CALERO-LANANG (CCL), MORONG RIZAL19DO0003 · ₱4,950,000.00 · mapped
- LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONCRETING OF ROAD, BRGY. SAN PEDRO, MORONG , RIZAL18DO0061 · ₱4,950,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE BUILDING AT STA. MARIA SUBDIVISION, PHASE 1, BRGY. DALIG ANTIPOLO CITY (SECOND DISTRICT)23DN0118 · ₱4,950,000.00 · mapped
- REHABILITATION OF ROAD AND DRAINAGE, BARANGAY SIENNA, QUEZON CITY25OF0106 · ₱4,860,707.15 · mapped
- FY 2023 DPWH INFRASTRUCTURE PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING TWO-STOREY AT PUROK LOGCOM, BARANGAY DELA PAZ, ANTIPOLO CITY, RIZAL (FIRST DISTRICT23DN0140 · ₱4,825,325.04 · mapped
- ROAD REHABILITATION, SITIO HALANG KAY BATOK ST., BRGY. MACAMOT, BINANGONAN, RIZAL19DN0042 · ₱4,816,350.50 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BAGBAG, QUEZON CITY20OF0110 · ₱4,801,427.25 · mapped
- REHABILITATION OF ROADS, PUROK 6, BRGY. CUPANG, ANTIPOLO CITY, RIZAL20DN0075 · ₱4,800,757.65 · mapped
- CONCRETING OF PANTAY ROAD - DONYA ANA, BRGY. DALIG FMR, BRGY. DALIG, TERESA, RIZAL19DO0087 · ₱4,777,082.32 · mapped
- CONCRETING OF SELECTA DRIVE/ DON RAMON/ DOÑA CARMEN, BRGY. PAG-IBIG SA NAYON, Q.C.19OF0131 · ₱4,753,331.39 · mapped
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING TWO-STOREY AT PHASE 3, STA. ELENA VILLAGE, BARANGAY SAN JOSE, ANTIPOLO CITY, RIZAL (SECOND DISTRICT)23DN0097 · ₱4,751,993.62 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG SAN FRANCISCO ELEMENTARY SCHOOL, BRGY. MUZON, TAYTAY, RIZAL18DN0062 · ₱4,706,742.98 · mapped
- REHABILITATION OF RIVERWALL ALONG MAPANDAN CREEK, DON MARIANO SUBDIVISION, BRGY. SAN JUAN, CAINTA, RIZAL19DN0136 · ₱4,702,495.22 · mapped
- CONSTRUCTION OF MPB AT VARGAS STREET, BRGY. CULIAT, Q.C.16OF0040 · ₱4,535,285.26
- BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF TWO-STOREY MULTI-PURPOSE BUILDING AT BLOCK 39, LOT 4, SITIO MAIGAYA, BRGY. SAN ISIDRO ANTIPOLO CITY (FIRST DISTRICT)23DN0114 · ₱3,960,000.00 · mapped
- CONSTRUCTION OF COL. GUIDO STREET, SAN ROQUE, ANGONO, RIZAL17DN0069 · ₱3,798,109.56
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
