Construction of Flood Mitigation Structure23MB0080

Construction of Concrete Revetment, Upper Sinawal Bridge, Sinawal River, General Santos City

Construction of Concrete Revetment, Upper Sinawal Bridge, Sinawal River, General Santos City is a DPWH-tracked public work in GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO), SOUTH COTABATO, Region XII. Reported contract value: ₱51,144,998.16. Status: Reported complete (DPWH). Contractor on record: RUCS KONSULT & CONST SERVICES / SALMEGA BUILDERS. Figures trace to sumbong.

GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO), SOUTH COTABATO, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱20,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23MB0080 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-15 → 2019-05-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · South Cotabato

Based on the coordinates published with the DPWH record and NOAH file SouthCotabato.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Concrete Revetment, Upper Sinawal Bridge, Sinawal River, General Santos City

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Floodway from Road 7 to Existing Creek, Brgy. Fatima, General Santos City
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

South Cotabato 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

1 projects · ₱51.1M total · 0 flags

4. Implementation

Contract Amount

₱51,144,998.16

Progress

Reported complete (DPWH)

Start Date

February 21, 2023

Target End

August 27, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.