Flood Control and Drainage16N00044

CONSTRUCTION OF TINAGO PRE-STRESSED CONCRETE GIRDER BRIDGE WITH RIVER CONTROL AND DREGING (120 LINEAR METERS), MALIMONO, SURIGAO DEL NORTE

CONSTRUCTION OF TINAGO PRE-STRESSED CONCRETE GIRDER BRIDGE WITH RIVER CONTROL AND DREGING (120 LINEAR METERS), MALIMONO, SURIGAO DEL NORTE is a DPWH-tracked public work in Region XIII, Region XIII. Reported contract value: ₱12,336,127.23. Status: Reported complete (DPWH). Contractor on record: PREMIUM MEGASTRUCTURES INC. Figures trace to dpwh.

Region XIII, Region XIII
Region: Region XIII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16N00044 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-06-12 → 2025-07-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Surigao del Norte

Based on the coordinates published with the DPWH record and NOAH file SurigaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF TINAGO PRE-STRESSED CONCRETE GIRDER BRIDGE WITH RIVER CONTROL AND DREGING (120 LINEAR METERS), MALIMONO, SURIGAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

99 projects · ₱12.6B total · 0 flags

4. Implementation

Contract Amount

₱12,336,127.23

Progress

Reported complete (DPWH)

Start Date

January 11, 2018

Target End

May 25, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.