Flood Control and Drainage25CM0027

CSSP, SIPAG, FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MATAIN RIVER FLOOD CONTROL, SUBIC, ZAMBALES

CSSP, SIPAG, FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MATAIN RIVER FLOOD CONTROL, SUBIC, ZAMBALES is a DPWH-tracked public work in Zambales 2nd DEO, Region III. Reported contract value: ₱94,180,638.29. Status: Past target date (DPWH On-Going). Contractor on record: REPOLMAN CONST CORP FORMERLY: REPOLMAN CONST. Figures trace to dpwh.

Zambales 2nd DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱94,180,638 · REPOLMAN CONSTRUCTION .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    74% reported · imagery 2019-10-27 → 2019-10-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Zambales

Based on the coordinates published with the DPWH record and NOAH file Zambales.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP, SIPAG, FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MATAIN RIVER FLOOD CONTROL, SUBIC, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Riverbank Structure along Santo Tomas River (Omaya-Balingcaguing-Paite Section), San Narciso, Zambales (Phase 1)
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Zambales 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25CM0027 - Const. of Matain River Flood Control

₱94,180,638.29 · REPOLMAN CONSTRUCTION .

Contractor

B

121 projects · ₱4.4B total · 0 flags

4. Implementation

Contract Amount

₱94,180,638.29

Progress

Past target date (DPWH On-Going)

Start Date

May 19, 2025

Target End

March 29, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.