Flood Control and Drainage23DQ0062

CONSTRUCTION OF REVETMENT ALONG IMUS RIVER (TRIBUTARY TO MANILA BAY), WEST SIDE, BARANGAY EMMANUEL BERGADO I, DASMARIÑAS CITY, CAVITE

CONSTRUCTION OF REVETMENT ALONG IMUS RIVER (TRIBUTARY TO MANILA BAY), WEST SIDE, BARANGAY EMMANUEL BERGADO I, DASMARIÑAS CITY, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱96,485,838.50. Status: Past target date (DPWH On-Going). Contractor on record: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST. Figures trace to dpwh.

Cavite 3rd DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures along Zapote River at Barangay San Nicolas 1, Bacoor, Cavite
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Cavite 3rd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

161 projects · ₱8.0B total · 11 flags

4. Implementation

Contract Amount

₱96,485,838.50

Progress

Past target date (DPWH On-Going)

Start Date

April 3, 2023

Target End

October 14, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.