Construction of Drainage Structure23IM0028

Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte

Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte is a DPWH-tracked public work in TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE, Region VIII. Reported contract value: ₱4,849,444.80. Status: Reported complete (DPWH). Contractor on record: G O C BUILDERS. Figures trace to sumbong.

TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23IM0028 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-16 → 2025-04-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Leyte

Based on the coordinates published with the DPWH record and NOAH file Leyte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Barangay 103, Palanog, Tacloban City, Leyte
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Tacloban City District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱4,849,444.80

Progress

Reported complete (DPWH)

Start Date

February 23, 2023

Target End

June 20, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.