Roads19CG0161

CONSTRUCTION OF ROAD, MINALIN, PAMPANGA

CONSTRUCTION OF ROAD, MINALIN, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱1,878,804.00. Status: Reported complete (DPWH). Contractor on record: CHOLO CONST AND TRADING. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROII-19-0008831 · ₱269,451 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19CG0161 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-02-23 → 2025-02-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ROAD, MINALIN, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROII-19-0008831

₱269,451.00 · FY2019

Released to Veterans General Hospital (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

139 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION AT SAN ROQUE BITAS CREEK, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2025₱91.7M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT PALINLANG CREEK, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2025₱91.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE II

Pampanga 1st DEO, Region III

2025₱91.5M
Past target date (DPWH On-Going)

Rehabilitation of River Channel and Construction of Concrete Slope Protection, Malisik R.C., Candaba, Pampanga

CANDABA (PAMPANGA), PAMPANGA, Region III

2022₱82.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - BALIWAG - CANDABA - STA. ANA RD. - K0067+433 - K0067+571, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2019₱67.9M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE I

Pampanga 1st DEO, Region III

2025₱64.2M
Past target date (DPWH On-Going)
View all 139 projects →

4. Implementation

Contract Amount

₱1,878,804.00

Progress

Reported complete (DPWH)

Start Date

August 2, 2019

Target End

September 15, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.