Buildings and Facilities18EF0152

CONST. OF 2-UNITS 2STY 2CL RW, BATARAZA, NATIONAL HIGH SCHOOL, BATARAZA, PALAWAN.

CONST. OF 2-UNITS 2STY 2CL RW, BATARAZA, NATIONAL HIGH SCHOOL, BATARAZA, PALAWAN. is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱17,762,508.13. Status: Reported complete (DPWH). Contractor on record: IVY MICHELLE CONST AND TRADING INC FORMERLY:IVY MICHELLE TRADING. Figures trace to dpwh.

Palawan 2nd DEO, Region IV-B
Region: Region IV-B

Follow the peso

3 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱30,000

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-18-0005523 ·

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-03-19 → 2025-07-27

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Inogbong Flood Control Structure, Bataraza, Palawan
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-18-0005523

₱0.00 · FY2018

Released to Division of Palawan (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

150 projects · ₱12.2B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BATARAZA-RIZAL CROSS COUNTRY (SUMBILING-CANIPAAN), PACKAGE B, PALAWA

Region IV-B, Region IV-B

2023₱282.6M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD, PACKAGE B, STA. 3+391.16-STA. 6+097.16, BATAR

Region IV-B, Region IV-B

2025₱279.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE C, STA. 6+097.16-STA. 9+297.66, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2025₱279.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF SANDOVAL-PAJO-(IGANG-IGANG)-SARONG-OCAYAN ROAD PACKAGE A, STA. 0+000.00-STA. 3+391.16, BATA

Region IV-B, Region IV-B

2025₱279.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD PACKAGE B, STA. 0+000.00-STA. 2+585.00, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2025₱279.4M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)- CONST. OF PANAS-TAGBITA DIVERSION ROAD, PACKAGE A, STA. 0+000-STA. 2+820, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2025₱279.3M
Past target date (DPWH On-Going)
View all 150 projects →

4. Implementation

Contract Amount

₱17,762,508.13

Progress

Reported complete (DPWH)

Start Date

August 12, 2018

Target End

January 8, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.