Bridges20CG0026

BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES-LAGUNDI BR. (B01477LZ) ALONG JOSE ABAD SANTOS AVE. (JASA), MEXICO, PAMPANGA

BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES-LAGUNDI BR. (B01477LZ) ALONG JOSE ABAD SANTOS AVE. (JASA), MEXICO, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱37,579,955.06. Status: Reported complete (DPWH). Contractor on record: HAIDEE CONST AND DEVELOPMENT CORP. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20CG0026 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-23 → 2025-01-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES-LAGUNDI BR. (B01477LZ) ALONG JOSE ABAD SANTOS AVE. (JASA), MEXICO, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Porac River, Jalung, Pampanga
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Pampanga 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

29 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (CONVENTION CENTER) INCLUDING SITE DEVELOPMENT, SAN FERNAND

Pampanga 1st DEO, Region III

2024₱187.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD (PACKAGE 2), PROVINCE OF ZAMBALES

Region III, Region III

2019₱142.7M
Reported complete (DPWH)
No sat.

CONST AND MAINT OF BRIDGES ALONG NATL ROADS WIDENING OF PERMANENT BRIDGES, INCL ROW TO MORE THAN 2 L

Region III, Region III

2017₱122.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORT AND DECLARED TOURISM-TO DECLARED TOURISM DESTINATIONS-UPGRADING OF DAMPAY SALAZA ACCESS ROAD LEADING TO MOUNT TAPULAO ECO TOURISM PROJECT, PALAUIG, ZAMBALES 2ND LEGISLATIVE DISTRICT

Region III, Region III

2016₱117.2M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM: BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVENTION CENTER), PHASE II, CITY OF SAN FERNANDO, PAMPANGA

Pampanga 1st DEO, Region III

2020₱95.0M
Reported complete (DPWH)

LAHAR CONTROL WORKS IN PASIG-POTRERO/GUGU RIVER STA. 0+188-STA. 2+100 GUGU RIVER STA. 2+300-STA.2+700 MINALIN TAIL DIKE, STA. 2+125.24-STA. 0+715 WEST MEGA DIKE, BACOLOR, PAMPANGA

Flood Control Management Cluster, Central Office

2017₱95.0M
Reported complete (DPWH)
View all 29 projects →

4. Implementation

Contract Amount

₱37,579,955.06

Progress

Reported complete (DPWH)

Start Date

July 6, 2020

Target End

August 25, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.