Roads19DM0052

NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVMENT - TERTIARY ROADS - CATANAUAN - BUENAVISTA RD - K0255+868 - K0260+696, K0260+712 - K0261+189, CATANAUAN, QUEZON

NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVMENT - TERTIARY ROADS - CATANAUAN - BUENAVISTA RD - K0255+868 - K0260+696, K0260+712 - K0261+189, CATANAUAN, QUEZON is a DPWH-tracked public work in Quezon 3rd DEO, Region IV-A. Reported contract value: ₱79,250,625.00. Status: Reported complete (DPWH). Contractor on record: I A BOSQUE CONST CORP. Figures trace to dpwh.

Quezon 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0004171 · ₱46,809,683 · release to the district office, not itemized per project

    Possible match · score 0.77

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱77,567,888 · I A BOSQUE CONST CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-10-16 → 2014-05-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVMENT - TERTIARY ROADS - CATANAUAN - BUENAVISTA RD - K0255+868 - K0260+696, K0260+712 - K0261+189, CATANAUAN, QUEZON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0004171

₱46,809,683.00 · FY2019

Released to Jose R. Reyes Memorial Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Network Development Program Off-Carriageway Impro

₱77,567,888.32 · I A BOSQUE CONST CORP

Award / contract ref: 19DM0052

Contractor

214 projects · ₱6.0B total · 1 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL STRUCTURE, PACKAGE 5, LUCE

Quezon 2nd DEO, Region IV-A

2025₱137.1M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF MISSING LINKS/NEW ROADS, EXTENSION OF QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD, SAN ANTONIO SECTION, SAN

Quezon 2nd DEO, Region IV-A

2020₱125.4M
Reported complete (DPWH)

Construction of Slope Protection along Lagnas River (Upstream - Package 4), Sariaya, Quezon

SARIAYA (QUEZON), QUEZON, Region IV-A

2022₱96.5M
Reported complete (DPWH)

Construction of Slope Protection along Lagnas River (Upstream - Package 5), Sariaya, Quezon

SARIAYA (QUEZON), QUEZON, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF QUEZON INDUSTRIAL HIGHWAY (

Quezon 2nd DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, SARIAYA BYPASS ROAD-K0121+722-K0122+052, K0122+173-K0122+655, K0123+029-K0123+467

Quezon 2nd DEO, Region IV-A

2024₱96.5M
Reported complete (DPWH)
View all 214 projects →

4. Implementation

Contract Amount

₱79,250,625.00

Progress

Reported complete (DPWH)

Start Date

August 24, 2019

Target End

August 17, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.