I A BOSQUE CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 214 linked DPWH project(s) totaling about ₱6,014,412,040.31. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
I A BOSQUE CONST CORP
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 214
- Total value
- ₱6,014,412,040.31
- Published flags
- 1
- Region
- Quezon 2nd DEO · Region IV-A
Licensed officers (PCAB)
- RENZLE ROYCE SARDUA BOSQUE · Authorized Managing Officer (PCAB license 12597) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for I A BOSQUE CONST CORP — not an accusation or finding of wrongdoing.
Score: 82.80 / 100 · Projects in sample: 214 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.1/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 65.1
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 161
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 206
- pastTargetOngoingProjects
- 43
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 214
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 214
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 214
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 214
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 202 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL STRUCTURE, PACKAGE 5, LUCE25DJ0082 · ₱137,071,556.85 · mapped
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF MISSING LINKS/NEW ROADS, EXTENSION OF QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD, SAN ANTONIO SECTION, SAN20DJ0113 · ₱125,449,999.93 · mapped
- Construction of Slope Protection along Lagnas River (Upstream - Package 5), Sariaya, Quezon22DJ0131 · ₱96,500,000.00 · mapped
- Construction of Slope Protection along Lagnas River (Upstream - Package 4), Sariaya, Quezon22DJ0129 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF QUEZON INDUSTRIAL HIGHWAY (23DJ0111 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, SARIAYA BYPASS ROAD-K0121+722-K0122+052, K0122+173-K0122+655, K0123+029-K0123+46724DJ0085 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 11), LUCENA CITY, QUEZON23DJ0117 · ₱96,500,000.00 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - GUMACA-PITOGO-MULANAY-SN NARCISO RD- K0213+000 - K0213+853, K0214+140 - K0214+235, K0215+ -514 - K0216+316, K0216+355 - K0217+014, K0217+027 - K0218+000, K0222+000 -K0224+000, K0225+000 - K0226+18DM0006 · ₱96,500,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF QUIAPO RIVER FLOOD CONTROL (PACKAGE 1), CANDELARIA, QUEZON24DJ0049 · ₱96,500,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL (PACKAGE 32), LUCENA CITY, QUEZON24DJ0110 · ₱96,500,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, QUEZON ECO-TOURISM-SARIAYA-CANDELARIA-TIAONG-SAN ANTONIO ROAD (PACKAGE 11), QUEZON23DJ0003 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF STA. LUCIA-BULAKIN BY-PASS R22DJ0006 · ₱96,499,998.94 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, SARIAYA BYPASS ROAD-K0120+472 - K0121+72224DJ0102 · ₱96,499,382.57 · mapped
- NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0221+328 - K0222+000, K0224+000 - K0225+000, K0226+000 - K0226+792, K0226+852 - K0230+355, MACALELON, QUEZON20DM0013 · ₱93,817,300.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES- SN NARCISO RD - K0343 + 000 - K0345 + 00025DM0117 · ₱93,607,860.31 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0347 + 000 - K0349 + 00025DM0116 · ₱93,607,214.80 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0345 + 000 - K0347 + 00025DM0115 · ₱93,605,089.17 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0351 + (-700) - K0353 + 00025DM0126 · ₱93,604,645.80 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0349 + 000 - K0351 + 00025DM0125 · ₱93,604,121.66 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION-MSR JCT-LOPEZ-BUENAVISTA RD-K0238+ (-1055) - K0240+310, K0240+332 - K0245+530, K0245+575 - K0249+181, LOPEZ -BUENAVISTA SECTION18DM0007 · ₱93,100,774.42 · mapped
- ROAD UPGRADING (CONCRETE PAVING) ALONG SAN FRANCISCO-SAN ANDRES-SAN NARCISO ROAD K0357+819-K0359+954, K0363+896-K0363+980, K0368+131-K0368+23115DM0168 · ₱89,609,867.55 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVMENT - TERTIARY ROADS - CATANAUAN - BUENAVISTA RD - K0255+868 - K0260+696, K0260+712 - K0261+189, CATANAUAN, QUEZON19DM0052 · ₱79,250,625.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL (PACKAGE 1), LUCENA CITY, QUEZON24DJ0008 · ₱79,130,000.00 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0325 + 716 - K0328 + 259, SAN FRANCISCO, QUEZON17DM0052 · ₱77,427,375.96
- NETWORK DEVELOPMENT : OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - MSR JCT LOPEZ -CATANAUAN RD - K0252+370 - K0255+199, CATANAUAN, QUEZON20DM0028 · ₱76,175,170.00 · mapped
- ASSET PRESERVATION - REHAB/ RECONS/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS- MULANAY-SN FRANCISCO RD - K0283 + 000 - K0284 + 800, K0285 + 741 - K0286 + 727, K0290 + 760 - K0291 + 000, K0294 + 000 - K0295 + 000, K0299 + 882 - K0300 + 00022DM0012 · ₱73,081,380.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL SYSTEM SITIO TALISAY, PAGSANGAHAN, QUEZON, SAN FRANCISCO, QUEZON20DM0036 · ₱71,837,495.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS MSR JCT - LOPEZ - CATANAUAN RD K0237+(-744) - K0238+899, K0243+636 - K0243+993, CATANAUAN, QUEZON19DM0088 · ₱65,034,245.00 · mapped
- ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO ROAD, K0225+000 - K0226+000, K0233+838 - K0234+000, K0234+371 - K0235+000 & K0241+600 - K0242+30019DM0086 · ₱61,181,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SAN NARCISO RD (S04256LZ) K0238+624 - K0241+454, GENERAL LUNA, QUEZON19DM0089 · ₱60,212,140.00 · mapped
- NETWORK DEVELOPMENT PROGRAM: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD-K0207+(-295) - K0211+000, PITOGO, QUEZON19DM0006 · ₱59,493,215.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING-SECONDARY ROADS, QUEZON-BATANGAS RD-K0096+175 - K0097+62024DJ0197 · ₱56,733,698.01 · mapped
- NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS -MULANAY-SN FRANCISCO RD - K0291 + 402 - K0291 + 702, K0291 + 727 - K0293 + 349,K0293 + 362 - K0293 + 793, K0302 + 769 - K0303 + 353, MULANAY, QUEZON21DM0038 · ₱56,114,750.00 · mapped
- ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD- K0219+700 - K0219+800, K0221+020 - K0221+060, K0221+100 - K0221+140, K0233+780 - K0233+83819DM0049 · ₱54,041,930.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-TERTIARY ROADS, SN PABLO BDRY-DOLORES-PINAGDANLAYAN RD-K0099+486-K0101+28822DJ0074 · ₱54,040,000.00 · mapped
- RETROFITTING/STRENGTHENING OF BRIDGES - MACALELON BR. (B02532LZ) AND CATANAUAN BR. (B02540LZ), GUMACA-PITOGO-MULANAY- SAN NARCISO RD18DM0002 · ₱52,748,500.00 · mapped
- Construction of Balubal River Flood Control, Sariaya, Quezon23DJ0022 · ₱49,000,000.00 · mapped
- Construction of Slope Protection along Dumacaa River, Barangay IX, Lucena City, Quezon22DJ0073 · ₱49,000,000.00 · mapped
- Construction of Slope Protection along Lagnas River (Downstream - Package 5), Sariaya, Quezon22DJ0132 · ₱49,000,000.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MSR JCT- LOPEZ- CATANAUAN RD - K0253 + 200 - K0255 + 199 CATANAUAN, QUEZON22DM0108 · ₱49,000,000.00 · mapped
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF QUEZON ECO-TOURISM ROAD-BARANGAY RANSOHAN ROAD, LUCENA CITY, QUEZON21DJ0107 · ₱49,000,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG IYAM RIVER, BARANGAY ILAYANG I22DJ0104 · ₱49,000,000.00 · mapped
- REHABILITATION/CONSTRUCTION OF SHORE PROTECTION (SEAWALL), POBLACION AT THE MUNICIPALITY OF PITOGO, QUEZONPITOGO, QUEZON21DM0040 · ₱49,000,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL, BRGY. 11, LUCENA CITY, QUEZON22DJ0061 · ₱49,000,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF SEAWALL, GENERAL LUNA, QUEZON20DM0046 · ₱49,000,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, QUEZON-BATANGAS RD, K0096+(-525) - K0096+17522DJ0085 · ₱48,999,995.75 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, PAGBILAO-DALAHICAN PORT RD (OLD MSR-MAYAO-TALAO-TALAO-DALAHICAN PORT) - (S06106LZ) CHAINAGE 10 - CHAINAGE 213, CHAINAGE 246 - CHAINAGE 69025DJ0114 · ₱47,532,395.62 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, QUEZON-BATANGAS RD - K0101 + 725 - K0102 + 42525DJ0115 · ₱47,531,160.49 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ)-K0106+804-K0107+499, CANDELARIA, QUEZON20DJ0003 · ₱45,569,999.99 · mapped
- LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF QUEZON ECO-TOURISM ROAD-BARANGAY RANSOHAN ROAD, LUCENA CITY, QUEZON21DJ0105 · ₱45,080,000.00 · mapped
Equipment & capacity
PCAB license
- License no.
- 12597
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Nov 29, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 12597); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 6 GPPB CPES releases; average final rating 93.7% over 5 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 25, 2025 | DPWH | ₱96,500,000.00 | Completed | 92.5% | 93.7% | 40th, p. 141 |
| May 5, 2025 | DPWH | ₱96,500,000.00 | Completed | 93.9% | 95.5% | 40th, p. 141 |
| Feb 2, 2025 | NIA (JV) | ₱46,975,839.00 | On-going | 86.9% | — | 39th (rev), p. 75 |
| Oct 21, 2024 | DPWH | ₱96,500,000.00 | On-going | 94.5% | — | 39th (rev), p. 92 |
| Aug 19, 2024 | DPWH | ₱94,569,636.00 | On-going | 96.6% | — | 38th, p. 103 |
| Sep 6, 2023 | DPWH | ₱49,000,000.00 | Final | 96.8% | 95.6% | 36th, p. 94 |
| Sep 6, 2023 | DPWH | ₱96,500,000.00 | Final | 88.8% | 89.5% | 36th, p. 94 |
| Feb 28, 2023 | DPWH | ₱96,500,000.00 | On-going | 94.9% | — | 35th, p. 76 |
| Jun 19, 2022 | DPWH | ₱28,735,707.00 | On-going | 91.2% | — | 34th, p. 38 |
| Sep 10, 2019 | DPWH | ₱93,100,774.00 | Completed | 94.2% | 94.2% | 40th, p. 141 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 224 awards · ₱5,920,569,242.53
- Province of Quezon Infrastructure: 14 awards · ₱330,797,772.00
- NIA Goods & services: 30 awards · ₱120,486,006.37
- National Power Corporation Goods & services: 2 awards · ₱111,705,641.35
- Philippine Ports Authority Infrastructure: 3 awards · ₱72,652,679.61
- National Power Corporation Infrastructure: 2 awards · ₱51,512,084.71
- Philippine Fisheries Development Authority Infrastructure: 3 awards · ₱40,644,414.40
- Philippine Ports Authority-Port District Of Southern Luzon Infrastructure: 3 awards · ₱36,487,314.86
- Philippine Ports Authority-Pmo Marinduque/Quezon Infrastructure: 3 awards · ₱29,200,132.55
- DSWD Infrastructure: 1 award · ₱22,762,965.00
- Municipality of San Francisco, Quezon Infrastructure: 4 awards · ₱18,479,907.29
- Municipality of Burdeos, Quezon Infrastructure: 18 awards · ₱16,470,110.27
- Philippine Coconut Authority Infrastructure: 4 awards · ₱15,610,804.40
- Municipality of Pola, Oriental Mindoro Infrastructure: 1 award · ₱13,997,168.75
- 25DK0145₱37,500,000.00· 2025-11-08· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 1ST ED
- 25DJ0148₱19,206,403.48· 2025-08-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0145₱4,801,493.78· 2025-08-22· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0144 (Re-ad)₱5,771,459.74· 2025-08-09· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DM0117 - Asset Preservation Program - Preventive₱93,607,860.31· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0115 - Asset Preservation Program - Preventive₱93,605,089.17· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0126 - Asset Preservation Program - Preventive₱93,604,645.80· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0125 - Asset Preservation Program - Preventive₱93,604,121.66· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DM0116 - Asset Preservation Program - Preventive₱93,607,214.80· 2025-05-26· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 3RD ED
- 25DJ0029₱4,859,400.00· 2025-05-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0037₱4,849,281.36· 2025-05-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0082₱137,071,556.85· 2025-05-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0031₱4,851,573.44· 2025-05-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0115₱47,531,160.49· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0111₱9,505,883.61· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0114₱47,532,395.62· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0120₱14,258,832.01· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0129₱4,801,533.71· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0113₱18,061,293.38· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0106₱7,201,447.54· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0097₱7,201,248.86· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0099₱7,202,279.50· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0102₱7,201,517.98· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0103₱7,203,007.72· 2025-03-19· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
- 25DJ0009₱7,270,005.88· 2025-02-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON 2ND ED
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →