CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER, ABUTMENT A, SAN MIGUEL, SURIGAO DEL SUR
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGO RIVER, ABUTMENT A, SAN MIGUEL, SURIGAO DEL SUR is a DPWH-tracked public work in Surigao del Sur 1st DEO, Region XIII. Reported contract value: ₱96,499,999.61. Status: Reported complete (DPWH). Contractor on record: ME 3 CONST. Figures trace to dpwh.
Total Contract Cost

