Construction of Slope Protection Structure22CI0001

Construction of Reinforced Concrete Slope Protection along Quitangil Creek (Sta. 14+450 to Sta. 15+169 R/D), Mawaque, Mabalacat City, Pampanga

Construction of Reinforced Concrete Slope Protection along Quitangil Creek (Sta. 14+450 to Sta. 15+169 R/D), Mawaque, Mabalacat City, Pampanga is a DPWH-tracked public work in MABALACAT CITY (PAMPANGA), PAMPANGA, Region III. Reported contract value: ₱19,597,211.89. Status: Reported complete (DPWH). Contractor on record: M C J VALENZUELA CONST ENT. Figures trace to sumbong.

MABALACAT CITY (PAMPANGA), PAMPANGA, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱30,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-22-0001629 · ₱159,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22CI0001 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-10-29 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Reinforced Concrete Slope Protection along Quitangil Creek (Sta. 14+450 to Sta. 15+169 R/D), Mawaque, Mabalacat City, Pampanga

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure/Slope Protection of Mesalipit Creek, Bacolor, Pampanga
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0001629

₱159,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0012252

₱1,104,074.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0002420

₱749,061.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-22-0002914

₱723,000,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0004169

₱110,000.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0002421

₱71,763.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0005826

₱46,080.00 · FY2022

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIII-22-0010260

₱254,906.00 · FY2022

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

58 projects · ₱1.9B total · 27 flags

4. Implementation

Contract Amount

₱19,597,211.89

Progress

Reported complete (DPWH)

Start Date

February 8, 2022

Target End

July 4, 2022