M C J VALENZUELA CONST ENT is listed as a company organization in Philippine public procurement records on this site, with 58 linked DPWH project(s) totaling about ₱1,891,496,793.00. Recorded delivery grade A (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
M C J VALENZUELA CONST ENT
ARegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 58
- Total value
- ₱1,891,496,793.00
- Published flags
- 27
- Region
- Bataan 1st DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for M C J VALENZUELA CONST ENT — not an accusation or finding of wrongdoing.
Score: 91.60 / 100 · Projects in sample: 58 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 93.8/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 93.8
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 51
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 55
- pastTargetOngoingProjects
- 1
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 58
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 58
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 86/100 · Weight: 11%
- projects
- 58
- componentScore
- 86
- flagsPerProject
- 0.47
- publishedV2Flags
- 27
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 58
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 58 geotagged projects (largest by contract value) — Open full map
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT IN CALAGUIMAN RIVER PHASE 2BSAMAL, BATAAN21CA0046 · ₱96,500,000.00 · mapped
- Construction of Flood Control Project along Pulo-Almacen River, Phase IV-DMC, Hermosa, Bataan24CA0048 · ₱96,499,999.74 · mapped
- FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BAMBAN SECTION, PHASE III-DM, HERMOSA, BATAAN24CA0026 · ₱96,499,999.70 · mapped
- FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ALMACEN RIVER CUT-OFF CHANNEL, PHASE IV-DMC, HERMOSA, BATAAN24CA0091 · ₱96,499,999.69 · mapped
- Construction of Flood Control Structure along Tuyo River (Phase II-DM), Abucay, Bataan24CA0017 · ₱96,499,999.65 · mapped
- Construction of Flood Control Project along Pentor - Balsik River, Balsik Section, Phase IV-DMC, Hermosa, Bataan24CA0047 · ₱96,499,998.25 · mapped
- Construciton of Flood Control Project Along Colo River , Maite Section , Phase IV-DMC, Hermosa, Bataan24CA0036 · ₱96,499,998.25 · mapped
- FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ORANI CHANNEL, PANTALAN LUMA, PHASE IV-DMC, ORANI, BATAAN24CA0073 · ₱94,139,421.25 · mapped
- FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MABIGA RIVER, TRIBUTARY TO COLO RIVER, PHASE III-DM, HERMOSA, BATAAN24CA0024 · ₱72,375,000.00 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER (PHASE III-DM), PALIHAN SECTION, HERMOSA, BATAAN24CA0025 · ₱72,374,999.68 · mapped
- Construction of Flood Control Structure along Tapulao River (Phase II-AA), Orani, Bataan23CA0040 · ₱48,999,999.97 · mapped
- Construction of Flood Control Structure along San Juan River, Sitio Pugad Lawin, Barangay San Juan, Phase 1A - CDA, Samal, Bataan22CA0046 · ₱48,999,999.81 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN-JOSE ABAD SANTOS AVENUE DIVERSION ROA22CA0063 · ₱48,999,998.91 · mapped
- Construction of Flood Control Structure along Tuyo River, Abucay Section (Phase II-AA), Abucay, Bataan23CA0039 · ₱48,999,991.82 · mapped
- Construction of Flood Control Structure along Capitangan River (Phase II-AA), Abucay, Bataan23CA0028 · ₱48,999,989.27 · mapped
- Construction of Flood Control Structure along Sapang Balsik Tributary to Almacen River (Phase II-AA), Hermosa, Bataan23CA0029 · ₱48,999,982.96 · mapped
- Construction of Concrete Slope Protection Structure along Sapangbalen Creek, Station 12+768 to Station 14+587 (R/D), Barangay Paralayunan, Mabalacat City, Pampanga22CI0006 · ₱48,993,897.23 · mapped
- Construction of Flood Control Structures along Balagtas River, Sta. 0 + 475 - Sta. 0 + 829, Barangay Panginay, Balagtas, Bulacan22CC0037 · ₱47,039,817.09 · mapped
- CONCRETING OF BRGY. MAGAPUA TO BRGY. MALAYAK FMR PHASE II, BRGY. MAGAPUA AND BRGY. MALAYAK, MOGPOG, MARINDUQUE23EA0079 · ₱46,763,297.85 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PAGALANGGANG RIVER (PAGALANGGANG SECTION), STA. 000+095.40 TO19CA0038 · ₱34,299,997.12 · mapped
- Construction of Flood Control Project along Colo River, San Benito Section, Phase VI-B, Dinalupihan, Bataan22CA0049 · ₱29,399,973.04 · mapped
- Construction of Flood Control Project along Colo River, San Benito Section, Phase VI-A, Dinalupihan, Bataan22CA0045 · ₱29,399,972.26 · mapped
- Construction of Slope Protection Structure along Quitangil Creek, Station 21+485 to Station 22+577 (R/D), Barangay Mawaque, Mabalacat City, Pampanga22CI0005 · ₱29,399,679.61 · mapped
- LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE,DRAINAGE/PROTECTION WORKS REHABILITATION OF SLOPE PROTECTION ALONG QUITANGIL CREEK,MAGALANG,PAMPANGA19CI0048 · ₱29,334,732.03 · mapped
- Construction of Flood Control Structure along Colo River San Benito Section, Phase IV-A, Dinalupihan, Bataan22CA0043 · ₱23,956,086.13 · mapped
- Construction of Flood Control Project along Colo River, Maite Section Phase CMD-1 Hermosa, Bataan23CA0045 · ₱19,799,993.13 · mapped
- Construction of Reinforced Concrete Slope Protection along Sapang Balen River, Sitio Mapiña, Magalang, Pampanga23CI0129 · ₱19,797,019.05 · mapped
- Construction of Reinforced Concrete Slope Protection along Quitangil Creek, (Station 25+170 to Station 26+630 (R/D), Brgy. Mabiga, Mabalacat City, Pampanga22CI0118 · ₱19,790,645.85 · mapped
- Construction of Reinforced Concrete Slope Protection along Quitangil Creek, Brgy. Mawaque, Mabalacat, Pampanga23CI0130 · ₱19,769,259.83 · mapped
- Construction of Reinforced Concrete Slope Protection along Quitangil Creek, Sto. Niño, Magalang, Pampanga23CI0109 · ₱19,762,442.35 · mapped
- Construction of Reinforced Concrete Slope Protection along Sapang Balen River, Brgy. Sta. Maria, Magalang, Pampanga23CI0132 · ₱19,721,987.26 · mapped
- Construction of Damaged Flood Control Structure Barangay Pulo, Hermosa, Bataan23CA0012 · ₱19,599,999.58 · mapped
- Construction of Reinforced Concrete Slope Protection along Quitangil Creek (Sta. 14+450 to Sta. 15+169 R/D), Mawaque, Mabalacat City, Pampanga22CI0001 · ₱19,597,211.89 · mapped
- Construction of Slope Protection Structure along Quitangil Creek, Station 24+450 to Station 25+170 (R/D), Barangay Mawaque, Mabalacat City, Pampanga22CI0016 · ₱19,592,440.23 · mapped
- Construction of Concrete Slope Protection Structure along Sapangbalen Creek (Sta. 11+803 to Sta. 12+504 R/D), Barangay Sto. Rosario, Magalang, Pampanga22CI0003 · ₱18,974,602.76 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/ FACILITIES - CONSTRUCTION/ REHABILITATION OF ANAO CREEK WITH SLOPE PROTECTION, ANAO, MEXICO, PAMPANGA21CG0212 · ₱14,107,496.23 · mapped
- CONCRETING OF PUROK 3 SITIO GUIZO, BARANGAY PALILI FMR, BARANGAY PALILISAMAL, BATAAN22CA0069 · ₱12,675,759.98 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -PRIMARY ROADS - JOSE ABAD SANTOS AVENUE (JASA) - K0101+424 - K0101+847, DINALUPIHAN, BATAAN22CA0025 · ₱9,799,999.98 · mapped
- Construction of Flood Control Project along Sapa Creek, Barangay Sapa, Samal, Bataan22CA0052 · ₱9,799,999.76 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, ABUCAY, BATAAN23CA0066 · ₱9,799,999.64 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. CAPITANGAN, ABUCAY, BATAAN23CA0067 · ₱9,799,998.76 · mapped
- CONCRETING OF SITIO GOMEZ, SITIO SANGANGGA, BARANGAY MABATANG FMR, BARANGAY MABATANGABUCAY, BATAAN19CA0120 · ₱9,652,495.00 · mapped
- CONCRETING OF SISON ST. PUROK 1, BARANGAY SAN SIMON FMR, BARANGAY SAN SIMON, DINALUPIHAN, BATAAN19CA0119 · ₱9,652,495.00 · mapped
- CONSTRUCTION/REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), BUNGAD, Q.C.19OF0272 · ₱9,602,010.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (DISASTER MANAGEMENT/EVACUATION CENTER) BRGY. PAGALA, BALIAUG, BULACAN18CC0362 · ₱9,460,651.17 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BALIUAG, BULACAN18CC0211 · ₱9,383,594.81 · mapped
- ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- TERTIARY ROADS - JCT. LAYAC - BALANGA- MARIVELES PORT ROAD- KO105+173.05 - KO105+543, HERMOSA, BATAAN23CA0006 · ₱7,466,618.03 · mapped
- CONSTRUCTION/COMPLETION OF FOUR (4) STOREY- EIGHT (8) CLASSROOMS SCHOOL BUILDING, JOSE C. PAYUMO JR. MEMORIAL HIGH SCHOOLDINALUPIHAN, BATAAN21CA0094 · ₱5,479,832.47 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. GUGO, SAMAL, BATAAN22CA0076 · ₱4,949,997.94 · mapped
- BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY SUMALO, HERMOSA, BATAAN23CA0001 · ₱4,949,996.05 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
