Construction of Flood Control Structure along San Juan River, Sitio Pugad Lawin, Barangay San Juan, Phase 1A - CDA, Samal, Bataan
Construction of Flood Control Structure along San Juan River, Sitio Pugad Lawin, Barangay San Juan, Phase 1A - CDA, Samal, Bataan is a DPWH-tracked public work in SAMAL (BATAAN), BATAAN, Region III. Reported contract value: ₱48,999,999.81. Status: Reported complete (DPWH). Contractor on record: M C J VALENZUELA CONST ENT. Figures trace to sumbong.
Total Contract Cost





