Flood Control and Drainage21CG0212

LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/ FACILITIES - CONSTRUCTION/ REHABILITATION OF ANAO CREEK WITH SLOPE PROTECTION, ANAO, MEXICO, PAMPANGA

LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/ FACILITIES - CONSTRUCTION/ REHABILITATION OF ANAO CREEK WITH SLOPE PROTECTION, ANAO, MEXICO, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱14,107,496.23. Status: Reported complete (DPWH). Contractor on record: M C J VALENZUELA CONST ENT 40623. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱15,400,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Porac River, Jalung, Pampanga
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Pampanga 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 40623

32 projects · ₱846.1M total · 0 flags

Other projects by this contractor

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT IN CALAGUIMAN RIVER PHASE 2BSAMAL, BATAAN

Bataan 1st DEO, Region III

2021₱96.5M
Reported complete (DPWH)

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BAMBAN SECTION, PHASE III-DM, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱96.5M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ALMACEN RIVER CUT-OFF CHANNEL, PHASE IV-DMC, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ORANI CHANNEL, PANTALAN LUMA, PHASE IV-DMC, ORANI, BATAAN

Bataan 1st DEO, Region III

2024₱94.1M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MABIGA RIVER, TRIBUTARY TO COLO RIVER, PHASE III-DM, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱72.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER (PHASE III-DM), PALIHAN SECTION, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱72.4M
Reported complete (100% progress, DPWH status On-Going)
View all 32 projects →

4. Implementation

Contract Amount

₱14,107,496.23

Progress

Reported complete (DPWH)

Start Date

January 17, 2022

Target End

May 16, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.