Flood Control and Drainage19CI0048

LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE,DRAINAGE/PROTECTION WORKS REHABILITATION OF SLOPE PROTECTION ALONG QUITANGIL CREEK,MAGALANG,PAMPANGA

LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE,DRAINAGE/PROTECTION WORKS REHABILITATION OF SLOPE PROTECTION ALONG QUITANGIL CREEK,MAGALANG,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱29,334,732.03. Status: Reported complete (DPWH). Contractor on record: M C J VALENZUELA CONST ENT 40623. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

GAA FY2019 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 40623

32 projects · ₱846.1M total · 0 flags

Other projects by this contractor

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT IN CALAGUIMAN RIVER PHASE 2BSAMAL, BATAAN

Bataan 1st DEO, Region III

2021₱96.5M
Reported complete (DPWH)

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BAMBAN SECTION, PHASE III-DM, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱96.5M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ALMACEN RIVER CUT-OFF CHANNEL, PHASE IV-DMC, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG ORANI CHANNEL, PANTALAN LUMA, PHASE IV-DMC, ORANI, BATAAN

Bataan 1st DEO, Region III

2024₱94.1M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MABIGA RIVER, TRIBUTARY TO COLO RIVER, PHASE III-DM, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱72.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER (PHASE III-DM), PALIHAN SECTION, HERMOSA, BATAAN

Bataan 1st DEO, Region III

2024₱72.4M
Reported complete (100% progress, DPWH status On-Going)
View all 32 projects →

4. Implementation

Contract Amount

₱29,334,732.03

Progress

Reported complete (DPWH)

Start Date

July 5, 2019

Target End

January 30, 2020