Roads20GM0002

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, BACOLOD SOUTH RD (KABANKALAN - HINOBAAN SECTION) - K0099+935 - K0100+194, K0100+210 - K0104+580 BRGY. GALICIA, ILOG AND BRGY. MAMBUGSAY & GUILJUNGAN, CAUAYAN, NEGROS OCCIDENTAL

ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, BACOLOD SOUTH RD (KABANKALAN - HINOBAAN SECTION) - K0099+935 - K0100+194, K0100+210 - K0104+580 BRGY. GALICIA, ILOG AND BRGY. MAMBUGSAY & GUILJUNGAN, CAUAYAN, NEGROS OCCIDENTAL is a DPWH-tracked public work in Negros Occidental 3rd DEO, Negros Island Region. Reported contract value: ₱48,999,994.45. Status: Reported complete (DPWH). Contractor on record: SUPREME ABF CONST. Figures trace to dpwh.

Negros Occidental 3rd DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱46,549,953 · SUPREME ABF CONSTRUCTION AND CONSTRUCTION SUPPLY , .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-01-16 → 2025-08-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS, BACOLOD SOUTH RD (KABANKALAN - HINOBAAN SECTION) - K0099+935 - K0100+194, K0100+210 - K0104+580 BRGY. GALICIA, ILOG AND BRGY. MAMBUGSAY & GUILJUNGAN, CAUAYAN, NEGROS OCCIDENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Ilog-Bungol River, Ilog, Negros Occidental
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Negros Occidental 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20GM0002

₱46,549,952.56 · SUPREME ABF CONSTRUCTION AND CONSTRUCTION SUPPLY , .

Award / contract ref: 20GM0002

Contractor

B

449 projects · ₱16.9B total · 0 flags

Other projects by this contractor

No sat.

CLUSTER 20: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, SAN VICENTE, PALAWAN, 20.1: STA. 167+325-STA. 167+445; 20.2: STA. 169+254-STA. 169+405; 20.3:

Region IV-B, Region IV-B

2022₱257.1M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION TO VILLAFLOR SECTION, LEFT SI

Region VII, Region VII

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL

Region VII, Region VII

2023₱236.3M
Past target date (DPWH On-Going)
No sat.

CLUSTER 17: SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, 17.1: STA. 9+012-STA. 9+149; 17.2: STA. 7+893-STA. 7+946; 17.3: STA. 8+030-STA. 8+063; 17.4: STA. 7+94

Region IV-B, Region IV-B

2022₱216.3M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL

Region VII, Region VII

2023₱214.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 165+662-STA. 165+924, PALAWAN

Region IV-B, Region IV-B

2022₱193.0M
Reported complete (DPWH)
View all 449 projects →

4. Implementation

Contract Amount

₱48,999,994.45

Progress

Reported complete (DPWH)

Start Date

May 26, 2020

Target End

January 9, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.