Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 2, Tagoloan, Misamis Oriental
Construction of Flood Control Structure along Pugaan River (Upstream of Sta. Ana Bridge), Phase 2, Tagoloan, Misamis Oriental is a DPWH-tracked public work in TAGOLOAN (MISAMIS ORIENTAL), MISAMIS ORIENTAL, Region X. Reported contract value: ₱96,500,000.00. Status: Reported complete (DPWH). Contractor on record: RITCHE-NATHALIE DEVELOPMENT CORP FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN MERCHANDISE. Figures trace to sumbong.
Total Contract Cost



