Roads19HC0026

003: CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION /IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS- TAMING BARANGAY ROAD LEADING TO GRAND CANYON VIEW OF DANAO ADVENTURE PARK, BRGY. TAMING, DANAO, BOHOL

003: CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION /IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS- TAMING BARANGAY ROAD LEADING TO GRAND CANYON VIEW OF DANAO ADVENTURE PARK, BRGY. TAMING, DANAO, BOHOL is a DPWH-tracked public work in Bohol 2nd DEO, Region VII. Reported contract value: ₱9,341,339.13. Status: Reported complete (DPWH). Contractor on record: CEBU 7H TECHNOCHEM INDUSTRIES INC. Figures trace to dpwh.

Bohol 2nd DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked from public records. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    Not yet linked

  2. 2. SARO / NCA release

    NCA NCA-ROVII-19-0011352 · ₱9,308,000

    Possible match · score 0.79

    DBM release source ↗
  3. 3. PhilGEPS award

    Not yet linked

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-07-28 → 2017-07-28

    Same record (DPWH contract ID)

    DPWH source ↗
  5. 5. COA audit finding

    Not yet linked

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: 003: CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION /IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS- TAMING BARANGAY ROAD LEADING TO GRAND CANYON VIEW OF DANAO ADVENTURE PARK, BRGY. TAMING, DANAO, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROVII-19-0011352

₱9,308,000.00 · FY2019

Released to Sikatuna National Agricultural High Sch (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

121 projects · ₱5.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURE AT BARANGAY PITOGO, CARLOS P. GARCIA, BOHOL

Region VII, Region VII

2024₱197.6M
Past target date (DPWH On-Going)
No sat.

OO 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROADS, JCT. (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD, K0017+000-K0017+065, K0017+572-K0018+000, K0019+000-K0019+906, K0024+000-K0025+000,K0

Region VII, Region VII

2024₱193.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD - K0031 + 580 - K0031 +735, K0032 + 262 - K0032 + 600, K0036 + 186 - K0036+686, K0036+692-K0036+

Region VII, Region VII

2024₱178.4M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-SECONDARY ROADS, LOAY INTERIOR ROAD - K0129 + 855 - K0132 + 013 , K0137 + 000 - K0139 + 582

Region VII, Region VII

2024₱168.8M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE ROAD SYSTEM, BRIDGE PROGRAM REPLACEMENT OF PERMANENT WEAK BRIDGES BACONG BR. (B00005BH) ALONG TAGBILARAN JETAFE SECTION, BOHOL PROVINCE

Region VII, Region VII

2018₱159.3M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-SECONDARY ROADS, TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA)-K0125+996-K0127+007, K0135+488-K0136+000, K0136+280-K0138+000, K0149+000-K0150+000, BOHOL PROVI

Region VII, Region VII

2023₱159.2M
Reported complete (DPWH)
View all 121 projects →

4. Implementation

Contract Amount

₱9,341,339.13

Progress

Reported complete (DPWH)

Start Date

July 16, 2019

Target End

September 6, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.