Buildings and Facilities18HM0022

CLUSTER VIII:1. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY, SABANG, LARENA, SIQUIJOR; 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABULIHAN INTEGRATED SCHOOL, LARENA, SIQUIJOR

CLUSTER VIII:1. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY, SABANG, LARENA, SIQUIJOR; 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABULIHAN INTEGRATED SCHOOL, LARENA, SIQUIJOR is a DPWH-tracked public work in Siquijor DEO, Negros Island Region. Reported contract value: ₱4,795,646.42. Status: Reported complete (DPWH). Contractor on record: ALOJA BUILDERS AND REALTY. Figures trace to dpwh.

Siquijor DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱46,805 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-18-0006349 · ₱5,776,000 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18HM0022 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-07 → 2015-02-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER VIII:1. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY, SABANG, LARENA, SIQUIJOR; 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABULIHAN INTEGRATED SCHOOL, LARENA, SIQUIJOR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱46,805,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures/Shore Protection at Looc-Cantaroc A, Maria, Siquijor
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-18-0006349

₱5,776,000.00 · FY2018

Released to Siquijor DEO (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

172 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING OF ROADS AT SITIO CANTUGOP, NAPO TO BRGY. PUTLONGCAM, ALICIA, BOHOL ST. 0+000.00 - STA.3+202.90 WITH EXCEPTION - SECTION 1; STA. 2+065.00 - STA. 2+365 - SECT

Bohol 3rd DEO, Region VII

2020₱49.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION (CONCRETING) OF ROAD AT BRGY. WEST CANAYAON TO BRGY. CAL

Bohol 3rd DEO, Region VII

2023₱39.6M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRGY. BINLOD BARANGAY ROAD, ARGAO, CEBU

Cebu 2nd DEO, Region VII

2025₱39.5M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION (CONCRETING) OF ROAD AT BARANGAY BUGANG SUR TO BARANGAY C

Bohol 3rd DEO, Region VII

2023₱34.6M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROADS, VALENCIA, BOHOL, SEC. 1: STA. 0+000.00 - STA

Bohol 3rd DEO, Region VII

2024₱34.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES - SECONDARY ROADS, TAGB. EAST ROAD (TAGB.-JAGNA), JAGNA, BOHOL K0193+620.00 - K0193+6

Bohol 3rd DEO, Region VII

2021₱28.1M
Reported complete (DPWH)
View all 172 projects →

4. Implementation

Contract Amount

₱4,795,646.42

Progress

Reported complete (DPWH)

Start Date

February 21, 2018

Target End

June 30, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.