DPWH projects in Siquijor
745 DPWH public works projects are recorded in Siquijor (Negros Island Region), with start dates from 2016 to 2025. Recorded contract values total about ₱10,919,920,550.76. 519 are recorded at 100% progress and 74 are flood control works. Figures are as recorded by DPWH; they are not findings.
Largest recorded projects
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag), Sipag - Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Tubod-Napo-Can₱141,855,000.00
- Convergence and Special Support Program, Basic Infrastructure Program (Bip), Bip - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Construction of Flood Control Structure at Taculing River Ii, Barangay Taculing, Laren₱97,019,888.00
- Oo1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Tertiary Roads, Siquijor-San Antonio-Campalanas Road, Tebjong, Siquijor, Siquijor₱96,500,000.00
- Oo1: Ensure Safe and Reliable National Road System, Asset Preservation- Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide- Tertiary Roads, Luyang-Poo-Lazi Rd - Koo12+008- K0012+148, K0013+008- K0013+031, K0013+133- K0013+387₱96,500,000.00
- 001: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Tertiary Roads, Siquijor-San Antonio-Campalanas Road, Siquijor, Siquijor₱96,500,000.00
- 002: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control Structure at Datag River, Helen, Larena, Siquijor₱96,500,000.00
- Oo1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse, and Landslide - Tertiary Roads, Luyang-Poo-Lazi Rd - K0013+449 - K0013+497, K0013+505 - K0013+653, K0013+665 - K001₱96,500,000.00
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag), Flood Mitigation Structures Protecting Major/Strategic Public Buildings/ Facilities, Construction of Flood Control Structure (Downstream) at Camogao, En₱96,500,000.00
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag), Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities, Construction of Flood Control Structure Phase Iii at Datag River (Do₱96,500,000.00
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag), Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities, Construction of Flood Control Structure Phase Ii at Datag River (Dow₱96,500,000.00
- Convergence and Special Support Program, Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239, Installation of Road Safety Structure Along Siquijor Circumferential Rd - K0062+832 - K0074+588₱96,500,000.00
- Construction of Flood Mitigation Structures Along Larena-Basac-Maria Road, Siquijor₱96,499,997.28
- Construction of Flood Control Structures (Shore Protection), Phase I at Lazi, Siquijor₱96,499,989.16
- Oo1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/Reconstruction of Roads With Slips, Slope Collapse and Landslide - Tertiary Roads, Luyang-Poo-Lazi Rd - K0018+218 - K0018+402, K0018+758 - K00130₱96,490,350.00
- Oo2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control Structure at Maria River (Upstream of Maria Bridge), Phase 1, Po₱96,485,000.00
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag), Flood Mitigation Structures Protecting Major/Strategic Public Buildings/ Facilities, Construction of Flood Control Structure (Downstream) at Tag-Ibo, sa₱96,412,907.00
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Flood Control Structure Phase I at Liki River B₱96,397,809.00
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag), Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities, Construction of Flood Control Structure (Upstream) at Tag-Ibo, San₱96,322,832.75
- Convergence and Special Support Program, Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239, Installation of Road Safety Structure Along Luyang-Poo-Lazi Rd - K0008+120 - K0008+955₱95,535,000.00
- Convergence and Special Support Program, Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239, Installation of Road Safety Structure Along Luyang-Poo-Lazi Rd - K0007+285 - K0008+120₱95,534,998.87
- Convergence and Special Support Program, Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239, Installation of Road Safety Structure Along Luyang-Poo-Lazi Rd - K0006+(-450) - K0007+285₱95,534,998.86
- Convergence and Special Support Program, Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239, Installation of Road Safety Structure Along Luyang-Poo-Lazi Rd - K0008+955 - K0009+790₱95,534,997.70
- Convergence and Special Support Program, Sustainable Infrastructure Projects Alleviating Gaps (Sipag) - Flood Mitigation Structures Protecting Major/ Strategic Public Buildings/ Facilities, Rehabilitation of Flood Control Structure Phase Ii at Liki River₱94,569,965.04
- Oo2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Flood Control Structure at Lotloton River (Upstream of Lotloton Bridge), Phas₱90,959,830.00
- 001:Ensure Safe and Reliable National Road System, Asset Preservation-Preventive Maintenance-Secondary Roads, Siquijor Circumferential Rd-K0008+437-K0009+438, K0009+720-K0013+095, K0036+433-K0039+362, Siquijor, Siquijor₱89,895,740.26
