CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAYPOMBO RIVER, STA. 14+250 - STA. 14+650 (M. SAPA SECTION), SANTA MARIA, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAYPOMBO RIVER, STA. 14+250 - STA. 14+650 (M. SAPA SECTION), SANTA MARIA, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱96,496,555.72. Status: Past target date (DPWH On-Going). Contractor on record: M3 KONSTRACT CORP FORMERLY:MARGARITA CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

