Construction of Flood Mitigation Structure21PM0004

Construction of Bunot Flood Control, Sta. 121 + 475 - Sta. 121 + 860 (L.S.), Paracelis, Mountain Province

Construction of Bunot Flood Control, Sta. 121 + 475 - Sta. 121 + 860 (L.S.), Paracelis, Mountain Province is a DPWH-tracked public work in MOUNTAIN PROVINCE, Cordillera Administrative Region. Reported contract value: ₱19,600,000.00. Status: Reported complete (DPWH). Contractor on record: J M DAPING CONST SERVICES. Figures trace to sumbong.

MOUNTAIN PROVINCE, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱20,000

    Probable match · score 0.98

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-21-0007841 · ₱83,131,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21PM0004 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-29 → 2020-02-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱50,909 per linear m= 0.7x the Cordillera Administrative Region median (n=212)

Contract cost ₱19,600,000 ÷ 385 linear m read from the DPWH title (“Sta. 121 + 475 - Sta. 121 + 860”; station range length (Sta. a+b to c+d)). National percentile: 14. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Mountain Province

Based on the coordinates published with the DPWH record and NOAH file MountainProvince.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Bunot Flood Control, Sta. 121 + 475 - Sta. 121 + 860 (L.S.),  Paracelis, Mountain Province

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bunot Flood Control, Sta. 121 + 475 - Sta. 121 + 860 (L.S.), Paracelis, Mountain Province
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0007841

₱83,131,000.00 · FY2021

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-21-0014080

₱10,000,000.00 · FY2021

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

27 projects · ₱370.3M total · 0 flags

Other projects by this contractor

No sat.

CSSP-TRIP: TADIAN-SAGADA VIA BESAO

Mountain Province 1st DEO, Cordillera Administrative Region

2023₱29.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS -AGUINALDO - NATONIN ROAD (PACKAGE A), MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2024₱24.5M
Reported complete (DPWH)
No sat.

CSSP: TADIAN-SAGADA VIA BESAO LEADING TO TIRAD PASS VIEW, FIDELISAN FALLS, SUMAGUING CAVE, BALANGAGAN CAVE, AYYUWENG DI LAMBAK ED TADIAN FESTIVAL, KILTEPAN SUNRISE, BESAO SUNSET HANGING COFFINS, ECHO VALLEY, TADIAN, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2022₱22.1M
Reported complete (DPWH)
No sat.

CSSP-TRIP, TADIAN - SAGADA VIA BESAO LEADING TO TIRAD PASS VIEW, FIDELISAN FALLS, SUMAGUING CAVE, BALANGAGAN CAVE, AYYUWENG DI LAMBAK ED TADIAN FESTIVAL, KILTEPAN SUNRISE, BESAO SUNSET HANGING COFFINS, ECHO VALLEY, TADIAN, MOUNTAIN PROVINCE

Mountain Province 1st DEO, Cordillera Administrative Region

2024₱19.6M
Reported complete (DPWH)
No sat.

Construction of Masablang Flood Control, Bantay, Paracelis, Mountain Province

PARACELIS (MOUNTAIN PROVINCE), MOUNTAIN PROVINCE, Cordillera Administrative Region

2024₱19.6M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROAD-TERTIARY ROADS BANANAO ACCESS RD K0466+743-K0467+338 PARACELIS, MOUNTAIN PROVINCE

Mountain Province 2nd DEO, Cordillera Administrative Region

2023₱19.4M
Reported complete (DPWH)
View all 27 projects →

4. Implementation

Contract Amount

₱19,600,000.00

Progress

Reported complete (DPWH)

Start Date

April 6, 2022

Target End

October 7, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.