J M DAPING CONST SERVICES is listed as a company organization in Philippine public procurement records on this site, with 27 linked DPWH project(s) totaling about ₱370,331,752.88. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
J M DAPING CONST SERVICES
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 27
- Total value
- ₱370,331,752.88
- Published flags
- 0
- Region
- Mountain Province 2nd DEO · Cordillera Administrative Region
Licensed officers (PCAB)
- Jerry Mayam-Es Daping · Authorized Managing Officer (PCAB license 43520) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for J M DAPING CONST SERVICES — not an accusation or finding of wrongdoing.
Score: 80.30 / 100 · Projects in sample: 27 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 70.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 70.7
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 25
- pastTargetOngoingProjects
- 4
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 27
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 27
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 27
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
27 geotagged projects — Open full map · Download projects (CSV)
- CSSP-TRIP: TADIAN-SAGADA VIA BESAO23PI0011 · ₱29,400,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS -AGUINALDO - NATONIN ROAD (PACKAGE A), MOUNTAIN PROVINCE24PM0007 · ₱24,500,000.00 · mapped
- CSSP: TADIAN-SAGADA VIA BESAO LEADING TO TIRAD PASS VIEW, FIDELISAN FALLS, SUMAGUING CAVE, BALANGAGAN CAVE, AYYUWENG DI LAMBAK ED TADIAN FESTIVAL, KILTEPAN SUNRISE, BESAO SUNSET HANGING COFFINS, ECHO VALLEY, TADIAN, MOUNTAIN PROVINCE22PI0011 · ₱22,119,580.00 · mapped
- Construction of Masablang Flood Control, Bantay, Paracelis, Mountain Province24PM0018 · ₱19,600,000.00 · mapped
- Construction of Bunot Flood Control, Sta. 121 + 475 - Sta. 121 + 860 (L.S.), Paracelis, Mountain Province21PM0004 · ₱19,600,000.00 · mapped
- CSSP-TRIP, TADIAN - SAGADA VIA BESAO LEADING TO TIRAD PASS VIEW, FIDELISAN FALLS, SUMAGUING CAVE, BALANGAGAN CAVE, AYYUWENG DI LAMBAK ED TADIAN FESTIVAL, KILTEPAN SUNRISE, BESAO SUNSET HANGING COFFINS, ECHO VALLEY, TADIAN, MOUNTAIN PROVINCE24PI0003 · ₱19,600,000.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGE PAVED ROAD-TERTIARY ROADS BANANAO ACCESS RD K0466+743-K0467+338 PARACELIS, MOUNTAIN PROVINCE23PM0005 · ₱19,445,160.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF ADDANG FLOOD CONTROL, STA. 130+430 - STA. 130+460 (R.S.),21PM0001 · ₱19,386,524.80 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS MT. PROVINCE - IFUGAO RD (KILING - PARACELIS SECT) - K0467+459 - K0469+00024PM0012 · ₱18,639,600.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - MT. PROVINCE - IFUGAO RD (KILING-PARACELIS SECT.) K0469+000 - K0469+76023PM0014 · ₱18,009,460.00 · mapped
- CONSTN/UPGRAD/REHAB OF DRAINAGE ALONG NATIONAL ROADS, MT PROV - CAGAYAN VIA TABUK - ENRILE RD - KO392+04724PI0095 · ₱15,856,400.00 · mapped
- CONSTN/REHAB/IMPVT OF BILA-OTUCAN LOCAL ROAD, BAUKO, MOUNTAIN PROVINCE20PI0086 · ₱14,850,000.00 · mapped
- CSSP, TADIAN - SAGADA VIA BESAO, TADIAN, MOUNTAIN PROVINCE25PI0005 · ₱14,547,700.01 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS, AGUINALDO - NATONIN ROAD (PACKAGE B), MOUNTAIN PROVINCE25PM0015 · ₱13,965,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BUTIQUE, STA.95+439 - STA. 95+59925PM0022 · ₱13,965,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS - MOUNTAIN PROVINCE-ISABELA RD -CHAINAGE 7393-CHAINAGE 765825PM0002 · ₱11,760,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) POBLACION, NATONIN-TOBOY ROAD IN SUPPORT OF24PM0037 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEM-CONSTRUCTION OF SOLAR WATER SYSTEM, NATONIN, MOUNTAIN PROVINCE23PM0037 · ₱9,800,000.00 · mapped
- CSSP - BUNGA-GAYANG-PALINA ROAD CONNECTING BUNGA AND GAYANG TO THE MOUNTAIN PROVINCE - ILOCOS SUR NATIONAL ROAD SUPPORTING HEIRLOOM RICE, COFFEE, BANANA CHIPS AND OTHER INDUSTRIES, BUNGA, TADIAN, MOUNTAIN PROVINCE, PACKAGE II21PI0061 · ₱9,800,000.00 · mapped
- CSSP: BALILI - SUYO - SAGADA ROAD LEADING TO SAGADA CAVES, RICE TERRACES, AND WATER FALLS, BONTOC AND SAGADA, MOUNTAIN PROVINCE21PI0041 · ₱9,800,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MT. PROVINCE-IFUGAO RD (KILING-PARACELIS SECT) - K0460 + 124 - K0460 + 194, K0473+ 650 - K0473 + 71022PM0007 · ₱7,761,600.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS MT. PROVINCE - IFUGAO RD (KILING-PARACELIS SECTION) K0474+837 - K0475+256 PARACELIS, MOUNTAIN PROVINCE23PM0013 · ₱6,922,296.44 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - IMPROVEMENT OF LOCAL ROAD, BARANGAY BANANAO, PARACELIS, MOUNTAIN PROVINCE22PM0028 · ₱4,950,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)- BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES, CONSTRUCTION OF ROAD, BARANGAY BANANAO, PARACELIS, MOUNTAIN PROVINCE25PM0035 · ₱4,950,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - IMPROVEMENT OF LOCAL ROAD, BARANGAY ANONAT PROPER, PARACELIS, MOUNTAIN PROVINCE22PM0027 · ₱4,950,000.00 · mapped
- NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS- TERIARY ROAD MT. PROVINCE-ISABELA RD (S00535LZ) CHAINAGE 21780-CHAINAGE 21883, PARACELIS, MOUNTAIN PROVINCE23PM0016 · ₱4,037,600.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAINWATER COLLECTOR SYSTEM23PM0044 · ₱2,315,831.63 · mapped
Equipment & capacity
PCAB license
- License no.
- 43520
- Category
- C · Small B
- Minimum net worth for this category
- ₱6,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱30M
- License valid until
- Jan 29, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 43520); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
10 evaluations listed across 5 GPPB CPES releases; average final rating 91.6% over 5 rated projects; 10 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 1, 2025 | DPWH | ₱19,600,000.00 | Completed | 98.4% | 89.7% | 40th, p. 151 |
| Apr 29, 2025 | DPWH | ₱18,639,600.00 | Completed | 92.5% | 95.3% | 40th, p. 151 |
| Apr 29, 2025 | DPWH | ₱24,500,000.00 | Completed | 96.1% | 92.6% | 40th, p. 151 |
| Nov 26, 2024 | DPWH | ₱24,500,000.00 | On-going | 90.3% | — | 39th (rev), p. 97 |
| Aug 16, 2024 | DPWH | ₱18,600,000.00 | On-going | 97.1% | — | 38th, p. 111 |
| Aug 14, 2024 | DPWH | ₱19,300,000.00 | On-going | 83.9% | — | 38th, p. 111 |
| Oct 21, 2022 | DPWH | ₱19,600,000.00 | Completed | 92.5% | 89.7% | 35th, p. 79 |
| Oct 20, 2022 | DPWH | ₱21,500,454.00 | Completed | 92.1% | 91.0% | 35th, p. 79 |
| Jul 2, 2022 | DPWH | ₱19,600,000.00 | On-going | 87.8% | — | 34th, p. 41 |
| Jul 1, 2022 | DPWH | ₱21,500,454.00 | On-going | 90.2% | — | 34th, p. 40 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →