Roads18FJ0021

ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, SECONDARY ROADS, BUENAVISTA- KAWAYAN ROAD, KO056+851- KO057+482, KO057+719- KO058+400

ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, SECONDARY ROADS, BUENAVISTA- KAWAYAN ROAD, KO056+851- KO057+482, KO057+719- KO058+400 is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱16,134,518.40. Status: Reported complete (DPWH). Contractor on record: ARKY CONST AND SUPPLY. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-18-0018045 · · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18FJ0021 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2010-02-11 → 2024-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, SECONDARY ROADS, BUENAVISTA- KAWAYAN ROAD, KO056+851- KO057+482, KO057+719- KO058+400

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bito River Control, San Fernando, Masbate
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-18-0018045

₱0.00 · FY2018

Released to Sta. Lucia National High School, Masantol (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

76 projects · ₱4.0B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE PROVINCE

Region V, Region V

2018₱179.1M
Reported complete (DPWH)
No sat.

CONST./REPAIR/REHAB./IMPVT. OF SWANG-AGPANABAT ROAD, ROMBLON, ROMBLON STA.15+290-STA.15+603.35, STA.15+877.92-STA. 16+637.30 STA.16+895.50-STA. 17+208.80, STA.17+500.00-STA.-STA.17+857.80 STA. 18+295.80-STA.20+513.60, STA. 20+660.00-STA.21+617.00 W/EXCEPT

Region IV-B, Region IV-B

2016₱168.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MASBATE-CATAINGAN-PLACER ROAD, MASBATE PROVINCE

Region V, Region V

2018₱155.6M
Reported complete (DPWH)
No sat.

ROAD UPGRADING OF SIBUYAN CIRC RD K0023+563-K0025+487; K0025+524-K0026+198; K0027+1086-K0029+237; SI

Region IV-B, Region IV-B

2016₱146.2M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUM. RD., KO029+237-KO030+346; KO030+408-KO031+364; KO031+431-KO031+497; KO031+571-KO031+638; KO032+555-KO033+073; KO033+086-KO033+615; KO034+094-KO035+690; KO035+908-KO036+528, SIBUYAN IS., ROMBLON

Region IV-B, Region IV-B

2016₱145.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE, TICAO ISLAND, MASBATE

Region V, Region V

2018₱144.7M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱16,134,518.40

Progress

Reported complete (DPWH)

Start Date

July 6, 2018

Target End

October 30, 2018

5. Audit