Flood Control and Drainage18BH0145

REHAB./ IMPROVEMENT OF VARIOUS FLOOD CONTROL STRUCTURES IN ISABELA - DAMMANG SECTION (STA. 0+000 - STA. 0+345)

REHAB./ IMPROVEMENT OF VARIOUS FLOOD CONTROL STRUCTURES IN ISABELA - DAMMANG SECTION (STA. 0+000 - STA. 0+345) is a DPWH-tracked public work in Isabela 4th DEO, Region II. Reported contract value: ₱44,868,192.83. Status: Reported complete (DPWH). Contractor on record: JC PALOMO CONST & CONST SUPPLY. Figures trace to dpwh.

Isabela 4th DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-18-0015413 · ₱316,938 · release to the district office, not itemized per project

    Possible match · score 0.75

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18BH0145 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-03-31 → 2025-06-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Isabela

Based on the coordinates published with the DPWH record and NOAH file Isabela.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHAB./ IMPROVEMENT OF VARIOUS FLOOD CONTROL STRUCTURES IN ISABELA - DAMMANG SECTION (STA. 0+000 - STA. 0+345)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dalibubon Flood Control Project, Jones, Isabela
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-18-0015413

₱316,938.00 · FY2018

Released to Division of Davao Oriental (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

15 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS ALONG DAANG MAHARLIKA (LZ) - K0249 + 000 - K0251 + 000, K0284 + 542.70 -

Region II, Region II

2024₱181.3M
Past target date (DPWH On-Going)
No sat.

OO 1: ENSURE SAFE AND RELIABLE NAT'L ROAD SYSTEM: NETWORK DEV'T: ROAD WIDENING-PRIMARY ROADS ALONG DAANG MAHARLIKA (LZ), K0309+000-K0309+467, K0314+000-K0314+208, K0317+000-K0317+245, K0335+000-K0336+000, CORDON, SAN ISIDRO, ECHAGUE, ISABELA

Region II, Region II

2018₱166.9M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG - LINAO - ATULAYAN - BAGAY - BUNTUN), PACKAGE 2, CAGAYAN

Region II, Region II

2023₱106.1M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - RAMON-CORDON-DIADI BYPASS ROAD, DIADI, NUEVA VIZCAYA

Region II, Region II

2024₱101.2M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAYOMBONG-QUEZON-BAGABAG ROAD, NUEVA VIZCAYA

Region II, Region II

2024₱95.1M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BAYOMBONG - QUEZON - BAGABAG ROAD, NUEVA VIZCAYA

Region II, Region II

2025₱52.8M
Past target date (DPWH On-Going)
View all 15 projects →

4. Implementation

Contract Amount

₱44,868,192.83

Progress

Reported complete (DPWH)

Start Date

September 11, 2018

Target End

May 18, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.