Water Provision and Storage17PL0018No coordinates published by DPWH

CONSTRUCTION (COMPLETION) OF NAMBARAN AGRO INDUSTRIAL (ELEB ANNEX) NHS WATERWORKS, NAMBARAN, TABUK CITY, KALINGA

CONSTRUCTION (COMPLETION) OF NAMBARAN AGRO INDUSTRIAL (ELEB ANNEX) NHS WATERWORKS, NAMBARAN, TABUK CITY, KALINGA is a DPWH-tracked public work in Lower Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱980,200.53. Status: Reported complete (DPWH). Contractor on record: YUNAKIM CONST. Figures trace to dpwh.

Lower Kalinga DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0008275 · ₱255,507 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17PL0018 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION (COMPLETION) OF NAMBARAN AGRO INDUSTRIAL (ELEB ANNEX) NHS WATERWORKS, NAMBARAN, TABUK CITY, KALINGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Ambato Flood Control, Kalinga
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0008275

₱255,507.00 · FY2017

Released to Eastern Samar Al National Comprehensive High be School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

58 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

COMPLETION OF FOUR-STOREY LIBRARY BUILDING, BULANAO CAMPUS - PHASE 2 - KALINGA STATE UNIVERSITY, BULANAO, TABUK CITY, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2024₱124.3M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD CONTROL MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE (RIGHT BANK SALTAN SECTION), PINUKPUK, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2023₱96.2M
Reported complete (100% progress, DPWH status On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TAGGAY-MABIGA (PINUKPUK)-BASSAO-TAWANG (BALBALAN) ROAD, PINUKPUK

Lower Kalinga DEO, Cordillera Administrative Region

2023₱77.1M
Past target date (DPWH On-Going)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD

Upper Kalinga DEO, Cordillera Administrative Region

2018₱51.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - MANUEL S. AGYAO BOULEVARD - K0510 + 084 - K0510 + 387, K0514 + 549 - K0514 + 789, K0518 + 000 - K0519 + 317, K0525 + 59

Lower Kalinga DEO, Cordillera Administrative Region

2025₱50.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF UPPER CHICO RIVER IRRIGA

Lower Kalinga DEO, Cordillera Administrative Region

2024₱42.8M
Past target date (DPWH On-Going)
View all 58 projects →

4. Implementation

Contract Amount

₱980,200.53

Progress

Reported complete (DPWH)

Start Date

May 29, 2017

Target End

July 27, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.