Construction of Flood Control Structure at Diliman 1st, Mabalas-balas Creek, Diliman 1st, San Rafaael, Bulacan
Construction of Flood Control Structure at Diliman 1st, Mabalas-balas Creek, Diliman 1st, San Rafaael, Bulacan is a DPWH-tracked public work in SAN RAFAEL (BULACAN), BULACAN, Region III. Reported contract value: ₱54,124,555.25. Status: Reported complete (DPWH). Contractor on record: EIRISH BUILDERS & SUPPLY INC. Figures trace to sumbong.
Total Contract Cost





