Construction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales
Construction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales is a DPWH-tracked public work in BOTOLAN (ZAMBALES), ZAMBALES, Region III. Reported contract value: ₱96,499,292.34. Status: Reported complete (DPWH). Contractor on record: NICLEDON CONST / GRACE CONST CORP. Figures trace to sumbong.
Total Contract Cost
