Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 23C00072 and 23CL0024 have near-identical descriptions about 1568 m apart (funding year 2023; ₱96.50M, ₱49.00M). Worth checking whether they cover the same works. It is possible that the two contracts represent consecutive phases of a larger project, with one phase simply not labeled as such.

Public record entityConstruction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales
LocationBOTOLAN (ZAMBALES), ZAMBALES, Region IIIContract 23C00072
Amount₱96,499,292.34 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure at Bucao River North Approach Downstream, Botolan, Zambales23C00072Flood control100%April 14, 2024December 16, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: June 20, 2023 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Similar project description near another contract in the same municipality

{
  "contractId": "23C00072",
  "fundingYear": 2023,
  "municipality": "BOTOLAN (ZAMBALES)",
  "distanceMeters": 1568.4292836604977,
  "titleSimilarity": 0.9668649107901445
}

Possible Innocent Explanations

  • Phased construction seasons
  • Upstream/downstream segments recorded separately

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesBotolanBangan
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault8.0 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated from SSA1 (2.01-3 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.