Construction of Slope Protection/ Flood Control Structure along Tambak River (Upstream), Phase 6, Iba, Zambales
Construction of Slope Protection/Flood Control Structure along Tambak River (Upstream), Phase 6, Iba, Zambales is a DPWH-tracked public work in IBA (CAPITAL) (ZAMBALES), ZAMBALES, Region III. Reported contract value: ₱49,500,000.00. Status: Reported complete (DPWH). Contractor on record: CDC CONST & SUPPLIES. Figures trace to sumbong.
Total Contract Cost
