Water Provision and Storage22EF0119

CLUSTER V - 1. CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) MALIHUD NATIONAL HIGH SCHOOL 2. CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) BONO-BONO ELEMENTARY SCHOOL

CLUSTER V - 1. CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) MALIHUD NATIONAL HIGH SCHOOL 2. CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) BONO-BONO ELEMENTARY SCHOOL is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱736,874.00. Status: Reported complete (DPWH). Contractor on record: F A M E CONST TRADING. Figures trace to dpwh.

Palawan 2nd DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱736,874 · FAME CONSTRUCTION TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-30 → 2025-07-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER V - 1. CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) MALIHUD NATIONAL HIGH SCHOOL 2. CONSTRUCTION OF RAIN WATER COLLECTION SYSTEM (RWCS) BONO-BONO ELEMENTARY SCHOOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Batang-Batang River Flood Control Structure in Narra, Palawan
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Palawan 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

22EF0119 (Re-bid 1)

₱736,874.00 · FAME CONSTRUCTION TRADING

Award / contract ref: 22EF0119 (Re-bid 1)

4. Implementation

Contract Amount

₱736,874.00

Progress

Reported complete (DPWH)

Start Date

January 10, 2023

Target End

March 25, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.