Roads23LI0021

ROAD WIDENING - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K1417+493-K1420+000, COMPOSTELA, DAVAO DE ORO

ROAD WIDENING - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K1417+493-K1420+000, COMPOSTELA, DAVAO DE ORO is a DPWH-tracked public work in Davao de Oro 2nd DEO, Region XI. Reported contract value: ₱57,548,411.66. Status: Reported complete (DPWH). Contractor on record: AB APONESTO CONST PARTS AND SUPPLY INC. Figures trace to dpwh.

Davao de Oro 2nd DEO, Region XI
Region: Region XI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23LI0021 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-09-02 → 2025-07-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱22,955,090 per km= 0.7x the Region XI median (n=118)

Contract cost ₱57,548,412 ÷ 2.507 km read from the DPWH title (“K1417+493-K1420+000”; K-post / station range length). National percentile: 14. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY - K1417+493-K1420+000, COMPOSTELA, DAVAO DE ORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Tagum - Libuganon River, Talomo, Sto. Tomas, Davao del Norte (Phase 1)
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Davao de Oro 2nd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱57,548,411.66

Progress

Reported complete (DPWH)

Start Date

February 16, 2023

Target End

November 10, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.