Roads17JD0025

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES,TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) POLANCO-MACLEODES ROAD K1830+527.20-K1830+586.90, K1842+860-K1843+285 & K1846+535-K1847+915,ZN

ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES,TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) POLANCO-MACLEODES ROAD K1830+527.20-K1830+586.90, K1842+860-K1843+285 & K1846+535-K1847+915,ZN is a DPWH-tracked public work in Zamboanga del Norte 1st DEO, Region IX. Reported contract value: ₱34,811,738.20. Status: Reported complete (DPWH). Contractor on record: MONTAÑO CONST. Figures trace to dpwh.

Zamboanga del Norte 1st DEO, Region IX
Region: Region IX

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱45,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-17-0019250 · · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱31,648,495 · MONTAÑO CONST & DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-06-01 → 2025-06-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱18,668,814 per km= 0.6x the Region IX median (n=132)

Contract cost ₱34,811,738 ÷ 1.865 km read from the DPWH title (“K1830+527.20-K1830+586.90; K1842+860-K1843+285; K1846+535-K1847+915”; K-post / station range length). National percentile: 32. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES,TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) POLANCO-MACLEODES ROAD K1830+527.20-K1830+586.90, K1842+860-K1843+285 & K1846+535-K1847+915,ZN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱45,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Dipolog River Flood Control Development Project, Barangay Turno and Barra, Dipolog City, Zamboanga del Norte
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-17-0019250

₱-227,620.00 · FY2017

Released to Pampanga 1st District Engineering Of (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱31,648,495.00 · MONTAÑO CONST & DEVELOPMENT CORP

Award / contract ref: 17JD0025

Contractor

C

158 projects · ₱10.6B total · 0 flags

4. Implementation

Contract Amount

₱34,811,738.20

Progress

Reported complete (DPWH)

Start Date

March 13, 2017

Target End

August 18, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.