Flood Control and Drainage20DN0169

CONSTRUCTION OF FLOODGATE, CAINTA RIVER, SAN FRANCISCO MANGGAHAN FLOODWAY, PHASE 3, BRGY. SAN JUAN, CAINTA, RIZAL

CONSTRUCTION OF FLOODGATE, CAINTA RIVER, SAN FRANCISCO MANGGAHAN FLOODWAY, PHASE 3, BRGY. SAN JUAN, CAINTA, RIZAL is a DPWH-tracked public work in Rizal 1st DEO, Region IV-A. Reported contract value: ₱0.00. Status: Past target date (DPWH On-Going). Contractor on record: SUPREME ABF CONST. Figures trace to dpwh.

Rizal 1st DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 91%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Gate, Cainta River, San Francisco Manggahan Floodway, Phase 3, Brgy. San Juan, Cainta, Rizal
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Rizal 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

449 projects · ₱16.9B total · 0 flags

Other projects by this contractor

No sat.

CLUSTER 20: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, SAN VICENTE, PALAWAN, 20.1: STA. 167+325-STA. 167+445; 20.2: STA. 169+254-STA. 169+405; 20.3:

Region IV-B, Region IV-B

2022₱257.1M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION TO VILLAFLOR SECTION, LEFT SI

Region VII, Region VII

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL

Region VII, Region VII

2023₱236.3M
Past target date (DPWH On-Going)
No sat.

CLUSTER 17: SUSTAINABLE INFRASTRUCTURE ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, 17.1: STA. 9+012-STA. 9+149; 17.2: STA. 7+893-STA. 7+946; 17.3: STA. 8+030-STA. 8+063; 17.4: STA. 7+94

Region IV-B, Region IV-B

2022₱216.3M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL

Region VII, Region VII

2023₱214.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, STA. 165+662-STA. 165+924, PALAWAN

Region IV-B, Region IV-B

2022₱193.0M
Reported complete (DPWH)
View all 449 projects →

4. Implementation

Contract Amount

₱0.00

Progress

Past target date (DPWH On-Going)

Start Date

December 10, 2020

Target End

July 7, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.