Buildings and Facilities16MA0002No coordinates published by DPWH

CLUSTER O CONSTRUCTION OF MULTI-PURPOSE BUILDING IN 1)BRGY. MASLABENG, BULUAN; 2)BRGY. MALANGIT, PANDAG AND 3)BRGY. KALIAN, MANGUDADATU, ALL IN MAGUNDANAO

CLUSTER O CONSTRUCTION OF MULTI-PURPOSE BUILDING IN 1)BRGY. MASLABENG, BULUAN; 2)BRGY. MALANGIT, PANDAG AND 3)BRGY. KALIAN, MANGUDADATU, ALL IN MAGUNDANAO is a DPWH-tracked public work in Cotabato City DEO, Region XII. Reported contract value: ₱7,314,720.71. Status: Reported complete (DPWH). Contractor on record: FFJJ CONST. Figures trace to dpwh.

Cotabato City DEO, Region XII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROX-16-0016922 · ₱822,203 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16MA0002 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER O CONSTRUCTION OF MULTI-PURPOSE BUILDING IN 1)BRGY. MASLABENG, BULUAN; 2)BRGY. MALANGIT, PANDAG AND 3)BRGY. KALIAN, MANGUDADATU, ALL IN MAGUNDANAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROX-16-0016922

₱822,203.00 · FY2016

Released to Lanao del Norte 2nd District Engineering Office To (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

788 projects · ₱27.5B total · 2 flags

4. Implementation

Contract Amount

₱7,314,720.71

Progress

Reported complete (DPWH)

Start Date

March 29, 2016

Target End

July 1, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.