REPAIR/ REHABILITATION OF BINWAAN BRIDGE ABUTMENT, SLOPE PROTECTION, & BRIDGE WATERWAY ALONG KALINGA-ABRA RD., KO497+844-KO497+858.98, BALBALAN, KALINGA
REPAIR/REHABILITATION OF BINWAAN BRIDGE ABUTMENT, SLOPE PROTECTION, & BRIDGE WATERWAY ALONG KALINGA-ABRA RD., KO497+844-KO497+858.98, BALBALAN, KALINGA is a DPWH-tracked public work in Upper Kalinga DEO, Cordillera Administrative Region. Reported contract value: ₱2,186,465.34. Status: Reported complete (DPWH). Contractor on record: BHM CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
