Flood Control and Drainage24OE0206

CONSTRUCTION OF RETARDING BASIN AT ESTERO DELA REINA (PHASE XXVI), MANILA CITY

CONSTRUCTION OF RETARDING BASIN AT ESTERO DELA REINA (PHASE XXVI), MANILA CITY is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱96,499,850.50. Status: Past target date (DPWH On-Going). Contractor on record: JELSIE CONST. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱12,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24OE0206 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    62% reported · imagery 2023-08-05 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · NCR, City of Manila, First District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RETARDING BASIN AT ESTERO DELA REINA (PHASE XXVI), MANILA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱12,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Estero de Binondo, Barangay 281, Manila City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

North Manila DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

62 projects · ₱4.1B total · 0 flags

Other projects by this contractor

No sat.

RETROFITTING OF MULTI-PURPOSE BUILDING, ISABELO DELOS REYES ELEMENTARY SCHOOL, MANILA CITY

North Manila DEO, National Capital Region

2025₱145.8M
Past target date (DPWH On-Going)
No sat.

RETROFFITING OF SCHOOL BUILDING AT LEGARDA ELEMENTARY SCHOOL, MANILA

North Manila DEO, National Capital Region

2025₱145.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING, SENTRO KOMUNIUDAD DE SANTA CRUZ, MANILA (PHASE 1)

North Manila DEO, National Capital Region

2025₱145.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 6

South Manila DEO, National Capital Region

2025₱143.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE, PHASE 5, BASECO COMPOUND, PORT AREA, MANILA

South Manila DEO, National Capital Region

2025₱143.0M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 7

South Manila DEO, National Capital Region

2025₱142.9M
Past target date (DPWH On-Going)
View all 62 projects →

4. Implementation

Contract Amount

₱96,499,850.50

Progress

Past target date (DPWH On-Going)

Start Date

January 28, 2025

Target End

December 16, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.