High Concurrent Workload for One Contractor

Contractor linked to many simultaneous projects or very high total value vs peers.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST holds 23 flood-control contracts worth ₱2.14B, 2.11× the 95th-percentile contractor total (₱1.01B); up to 13 ran at the same time. This is a capacity question worth examining. Large contractors may have the resources and experience to handle many projects at once.

Public record entityST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONSTOrganization record →
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 23Ongoing: 0Delayed: 0Status unknown: 0
Show 17 more projects in this bucket
Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos Norte22A00254Flood control100%January 10, 2023January 10, 2023—completedsumbong source
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Boli, Nueva Era, Ilocos Norte22A00252Flood control100%January 10, 2023January 10, 2023—completedsumbong source
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Cacanan 1, Nueva Era, Ilocos Norte22A00253Flood control100%January 10, 2023January 6, 2023—completedsumbong source
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Cacanan 2, Nueva Era, Ilocos Norte22A00265Flood control100%April 12, 2023April 12, 2023—completedsumbong source
Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Poblacion, Sitio Golbao, Nueva Era, Ilocos Norte22A00255Flood control100%November 11, 2022November 11, 2022—completedsumbong source
Construction of Flood Control Structure along Catanauan River (Sta. 2+000 - Sta. 2+375 Right-Side) Catanauan, Quezon22DM0007Flood control100%February 15, 2023February 15, 2023—completedsumbong source
Construction of Flood Control Structure along Lumintao River, Barangay Tanyag, Calintaan, Occidental Mindoro22E00007Flood control100%January 23, 2023August 31, 2022—completedsumbong source
Construction of Flood Control Structure, Brgy. Amontay, Pitogo, Quezon22DM0133Flood control100%May 27, 2023May 26, 2023—completedsumbong source
Construction of Patong Flood Flood Control, Hinunangan, Southern Leyte22IL0030Flood control100%October 13, 2022October 13, 2022—completedsumbong source
Construction of Protection Dike at Barangay 8, Mamburao, Occidental Mindoro24EB0032Flood control100%November 26, 2024September 15, 2024—completedsumbong source
Construction of River Protection Structure along San Cristobal River, (near Looc Bridge), Brgy. Looc, Calamba City, Laguna22DI0023Flood control100%February 15, 2023February 15, 2023—completedsumbong source
Construction of Riverbank Protection along Agno River, Barangay Panacol, Aguilar, Pangasinan, Phase III24A00201Flood control100%December 14, 2024July 8, 2024—completedsumbong source
Construction of Riverside Protection Structure along Apnikan River, Paluan, Mindoro Occidental24EB0101Flood control100%December 17, 2024June 15, 2024—completedsumbong source
Maintenance and Rehabilitation of Flood Control Structure along Ilugin River, Pasig City22OB0073Flood control100%October 9, 2022October 3, 2022—completedsumbong source
Construction of Revetment/Riverwall along Tunasan River, (near Narra Road), Brgy. San Antonio, San Pedro City, Laguna21DI0066100%August 9, 2022August 9, 2022—completedsumbong source
Construction of Slope Protection along Balanti Creek at Katipunan Extension, Marikina City23OB0023100%April 28, 2024March 14, 2024—completedsumbong source
Construction of Slope Protection along Cross-Country Road, Catarman to Mambajao (Package 1), Catarman, Camiguin22KE0080100%February 15, 2023September 1, 2024—completedsumbong source

Rule Definition

Active project count and total value vs peer 95th percentile.

Triggering Data & citations

Contractor carries far more concurrent flood-control value than peers

{
  "contractor": "ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST",
  "projectCount": 23,
  "totalValuePhp": 2137380306.46,
  "peerP95TotalPhp": 1014143494.4100002,
  "activeProjectCount": 0,
  "simultaneousThreshold": 25
}

Possible Innocent Explanations

  • Large national firm with many concurrent government clients
  • Data groups joint ventures under one name