Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 21, 2026

Duplicate or Near-Duplicate Projects

Very similar descriptions within ~100m or identical coordinates across contracts/years.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contracts 22HJ0029 and 24HJ0021 have near-identical descriptions at the same coordinates (funding years 2022, 2024; ₱14.70M, ₱29.40M). Worth checking whether they cover the same works. The second contract may be a continuation or extension of the first, but the title does not specify the segment covered.

Public record entityConstruction of Flood Control along Calamba River, Sta. 0+000 - Sta. 0+750, Guihulngan City, Negros Oriental
LocationCITY OF GUIHULNGAN (NEGROS ORIENTAL), NEGROS ORIENTAL, Region VIIContract 22HJ0029
Amount₱14,700,000.00 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control along Calamba River, Sta. 0+000 - Sta. 0+750, Guihulngan City, Negros Oriental22HJ0029Flood control100%September 17, 2022September 17, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 8, 2022 · Source fetched October 21, 2026

Rule Definition

Title similarity + distance or shared coordinates within municipality.

Triggering Data & citations

Identical coordinates shared by multiple contracts

{
  "contractId": "22HJ0029",
  "coordinates": {
    "lat": 10.17891,
    "lon": 123.28153
  },
  "otherContracts": [
    "24HJ0021"
  ]
}

Possible Innocent Explanations

  • Multi-component contracts sharing a single pin
  • GIS centroid placement

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)Negros OrientalCity of GuihulnganCalamba
Storms whose wind field reached it
Penha 2026Koto 2025Kalmaegi 2025
Hazard exposure
Active fault8.4 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)outside mapped flood zonesUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.