Pattern Consistent with Contract Splitting
Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: 6 contracts awarded to DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST by the same office started within 5 days, each between ₱42.5M and ₱50M (just under the ₱50M threshold), with 4 in the same municipality. It is possible that these are separate flood control projects in different barangays or sections, all scheduled together for efficiency.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Satellite before / after
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
| Project | Prog. | Target end | Actual end | Days late | Status |
|---|---|---|---|---|---|
| Construction of Tanggal Flood control Structure, Cordon, Isabela23BH0078Flood control | 100% | December 11, 2023 | December 11, 2023 | — | completedsumbong source |
Start: February 17, 2023 · Source fetched October 21, 2026
Rule Definition
≥3 contracts within 120 days, each 85–100% of ₱50M threshold, similar titles.
Triggering Data & citations
Cluster of contracts just under procurement threshold with similar scope
{
"deo": "Isabela 4th District Engineering Office",
"contractId": "23BH0078",
"contractor": "DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST",
"windowDays": 120,
"clusterSize": 6,
"thresholdPhp": 50000000,
"contractCostPhp": 48999983.08,
"averageTitleSimilarity": 0.9054933959843424
}Source documents
Possible Innocent Explanations
- Legitimate multi-lot procurement
- Different sites under same program