Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Cebu 4th District Engineering Office awarded 28 of 28 recorded flood-control contracts (100.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (29.6 percentage points higher; binomial p = 5.4e-05), across 12 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from highly competitive bidding or careful cost estimation that leaves little room below the ABC.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Cebu 4th District Engineering Office: contracts
28 of 28 contracts (100%) at ≥99.5% of ABC · peer baseline 70.4% · gap +29.6 pts · binomial p = 5.4e-5. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22HD0030 | Construction of Flood Control Structure along Sapang Dako River, Sta. 0+000 - Sta. 0+774, Barangay Calambua, San Remigio, Cebu | DINAH RBS CONST AND SUPPLY INC FORMERLY: DINAH JANE CONST AND SUPPLY | 100.00% | DPWH |
| 24HD0109 | Construction of Seawall at Tabogon Port, Tabogon Cebu | GONZALODO ENT | 100.00% | DPWH |
| 24HD0103 | Construction of Flood Control and Drainage System along Malingin River, Bogo City, Cebu | ADAMANT DEVELOPMENT CORP | 100.00% | DPWH |
| 24HD0031 | Construction of Flood Control Structure at Barangay La Paz, City of Bogo, Cebu | DINAH RBS CONST AND SUPPLY INC FORMERLY: DINAH JANE CONST AND SUPPLY | 100.00% | DPWH |
| 24HD0030 | Construction of Flood Control Structure at Tacup Bridge, San Remigio, Cebu | DINAH RBS CONST AND SUPPLY INC FORMERLY: DINAH JANE CONST AND SUPPLY | 100.00% | DPWH |
| 22HD0025 | Construction of Flood Control Structure along Bongon River, Tabuelan, Cebu | WTG CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23HD0052 | Construction of Drainage Outfall at Antonio y De Pio Highway, Barangay Tabunok, Sta. 000 + 000 - Sta. 000 + 300, Tabuelan, Cebu | WTG CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23HD0051 | Construction of Flood Control Structure at Cebu North Hagnaya Wharf Rd, Barangay Don Pedro Rodriguez, City of Bogo, Cebu | GONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R | 100.00% | DPWH |
| 24HD0106 | Construction of Flood Control and Drainage System at Barangay, Gawaygaway, San Remigio, Cebu | ADAMANT DEVELOPMENT CORP | 100.00% | DPWH |
| 24HD0032 | Construction of Flood Control Structure at Aningan Bridge, San Remigio, Cebu | WTG CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 22HD0024 | Construction of Flood Control Structure, Poblacion, Daanbantayan, Cebu | WTG CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24HD0104 | Construction of Flood Control Structure at Barangay Samosa, Tabogon, Cebu | QG DEVELOPMENT CORP | 100.00% | DPWH |
| 24HD0105 | Construction of Flood Control and Drainage System along Taytayan Creek, Taytayan, City of Bogo, Cebu | QM BUILDERS / ADAMANT DEVELOPMENT CORP | 100.00% | DPWH |
| 24HD0038 | Construction of Tarong-Talangnan Seawall, Madridejos, Cebu | WTG CONST & DEVELOPMENT CORP / ROVILLA CONST | 100.00% | DPWH |
| 23HD0032 | Construction of Flood Control Structure at Taytayan Bridge, Sta. 000 + 000 - Sta. 001 + 071, City of Bogo, Cebu | GONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R | 100.00% | DPWH |
| 22HD0015 | Construction of Flood Control Structure at Barangay Caduawan, Sta. 0+000 - Sta. 1+163, Tabogon, Cebu | PRIME GIGABUILD CONST CORP FORMERLY: RON DANIELL CONST CORP | 100.00% | DPWH |
| 24HD0033 | Construction of Flood Control Structure at Maraat Bridge, San Remigio, Cebu | DINAH RBS CONST AND SUPPLY INC FORMERLY: DINAH JANE CONST AND SUPPLY | 100.00% | DPWH |
| 22HD0016 | Construction of Flood Control Structure along Bangon River, Medellin, Cebu | GONZALODO ENT | 100.00% | DPWH |
| 22HD0017 | Construction of Flood Control Structure at Barangay Tacup, Sta. 0+000 - Sta. 0+774, San Remigio, Cebu | JJ &J CONST & GEN SUPPLY / SAN NARCISO BUILDERS CORP FOR SAN NARCISO | 100.00% | DPWH |
| 24HD0004 | Construction of Flood Control Structure at Magsa-ubay Bridge, Daanbantayan, Cebu | TCP BUILDERS | 100.00% | DPWH |
| 23HD0019 | Construction of Flood Control Structure at Magsa-ubay Bridge, Section 1 and 2, Sta. 000 + 000 - Sta. 000 + 306, Daanbantayan, Cebu | TCP BUILDERS | 100.00% | DPWH |
| 22HD0039 | Construction of Seawall, Medellin, Cebu | GONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R | 100.00% | DPWH |
| 23HD0031 | Construction of Flood Control Structure, Poblacion, Sta. 000 + 000 - Sta. 000 + 260, Daanbantayan, Cebu | WTG CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23HD0028 | Construction of Seawall, Sta. 000 + 000 - Sta. 000 + 386, Medellin, Cebu | GONZALODO ENT / RUDHIL CONST & ENT INC FORMERLY R | 100.00% | DPWH |
| 23HD0062 | Construction of Drainage System, Brgy. La Paz, Bogo City, Cebu | Z & G CONST SERVICES | 100.00% | DPWH |
| 21HD0054 | Rehabilitation of Flood Control along Balidbid River, Santa Fe, Cebu | WTG CONST & DEVELOPMENT CORP / ROVILLA CONST | 100.00% | DPWH |
| 23H00039 | Construction of Tabagak-Bunakan Seawall, Madridejos, Cebu | WTG CONST & DEVELOPMENT CORP / ROVILLA CONST | 100.00% | DPWH |
| 23H00040 | Construction of Mancilang-Malbago Seawall, Malbago, Madridejos, Cebu | WTG CONST & DEVELOPMENT CORP / ROVILLA CONST | 99.99% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Cebu 4th District Engineering Office",
"nearAbc": 28,
"trigger": "office_pattern_aggregate",
"officeId": "889f57b1-adf6-5896-8556-35b36a7df0bd",
"threshold": 0.995,
"binomialTailP": 0.00005397276569519688,
"nearAbcRatePct": 100,
"totalContracts": 28,
"baselineRatePct": 70.4,
"excessPctPoints": 29.6,
"expectedNearAbc": 19.7,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents