Contractor Concentration (Flood Control)

A contractor holds a very large share of flood-control contract value in a district or province.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: ABU CONST received 29.0% (₱517.05M of ₱1.78B) of recorded flood-control contract value in South Cotabato 2nd District Engineering Office across 36 contracts and 12 contractors, at or above the 25% share threshold (HHI 0.137). This may be due to a limited pool of qualified contractors or the contractor's strong local presence.

Public record entityABU CONSTOrganization record →
LocationSouth Cotabato 2nd District Engineering Office
Amount₱517,054,768.2829.0% of peer-group contract value in public records sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Flagged peer group: South Cotabato 2nd District Engineering Office

Reported complete (DPWH): 8Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Bank Protection along Ala River, Brgy. Dajay, Surallah, South Cotabato23M00231Flood control100%April 11, 2024April 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Bank Protection along Ala River, Brgy. Kolambog, Norala, South Cotabato23M00231Flood control100%April 11, 2024April 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Bank Protection along Banga River, Barangay Matapol, Norala, South Cotabato24MG0066Flood control100%September 29, 2024September 27, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Bank Protection along Banga River, Brgy. Malaya, Banga, South Cotabato23M00231Flood control100%April 11, 2024April 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Bank Protection along Banga River, Dumaguil Bridge Section, Barangay Dumaguil Norala, South Cotabato23M00074Flood control100%March 18, 2024March 18, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of River Bank Protection along Marbel River, Brgy. Namnama, City of Koronadal, South Cotabato23M00231Flood control100%April 11, 2024April 11, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Show 2 more projects in this bucket
Construction of River Bank Protection along Marbel River, Purok Upper Valley, Brgy. Sto. Niño, Koronadal City, South Cotabato23MG0013Flood control100%December 7, 2023December 7, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source
Construction of Riverbank Protection along Marbel River, Brgy. San Roque, Koronadal City, South Cotabato22MG0013Flood control100%November 24, 2022December 29, 2022No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Rule Definition

Share of contract value by contractor within DEO or province; flags top share > 40% or elevated HHI.

Triggering Data & citations

Contractor holds a large share of flood-control contract value in its district/province

{
  "hhi": 0.13661138772821116,
  "scope": "deo",
  "bucketKey": "deo:South Cotabato 2nd District Engineering Office",
  "contractor": "ABU CONST",
  "thresholds": {
    "share": 0.25,
    "minContracts": 3,
    "minBucketContracts": 10
  },
  "bucketTotalPhp": 1783468757.95,
  "contractorShare": 0.28991523735707386,
  "contractorTotalPhp": 517054768.28,
  "contractorContracts": 8
}

Possible Innocent Explanations

  • This may be due to a limited pool of qualified contractors or the contractor's strong local presence.

Cite this record

Love the Philippines. “Contractor Concentration (Flood Control) (C1): ABU CONST.” Source: sumbong. Data as of October 22, 2026. https://lovethephilippines.com/risk/1d0e3b17-1bdf-4992-8efc-5a7a7888a4bf

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.